A Perspective on Integrated Project Team Strategies

T.J. De Villiers, L. Pretorius
{"title":"A Perspective on Integrated Project Team Strategies","authors":"T.J. De Villiers, L. Pretorius","doi":"10.1109/IEMC.2006.4279905","DOIUrl":null,"url":null,"abstract":"The purpose of IPTS is to unite the core project participants (those 20% of project participants responsible for 80% of the impact on the project success) with a common goal, so that they focus on what is in the interest of the project and not on their company's interest or local optimisation. Like a tripod, Integrated Project Team Strategies (IPTS) are supported on three legs that are referred to as its core principles. These principles are a common project incentive scheme, well-defined project success criteria and project control systems and procedures that focus on the project's needs and do not entice local optimisation. Because monetary reward is a short-term motivator for change in personal behaviour, it is a carrot under the donkey's nose for the project management team and the core project participants. As all the core project participants in IPTS now share in the same incentive scheme, their actions will be focussed on the same target because it determines the size of their bonuses / incentives. Project success criteria are their common target. It is therefore important that project success criteria are well defined for all three areas of success namely project management success, product success and relationship success. Traditional project control systems and metrics, which were used to measure the progress of the project, measure progress in isolation because they do not consider the overall need of the project. Local optimisation like tons steel erected per hour may occur because that is how managers on the project are assessed, however, that is not in the interest of the project. IPTS measurement systems focus on what is in the interest of the project and use performance drivers like critical chain and balanced scorecards differently to entice the required behaviour.","PeriodicalId":153115,"journal":{"name":"2006 IEEE International Engineering Management Conference","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE International Engineering Management Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMC.2006.4279905","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of IPTS is to unite the core project participants (those 20% of project participants responsible for 80% of the impact on the project success) with a common goal, so that they focus on what is in the interest of the project and not on their company's interest or local optimisation. Like a tripod, Integrated Project Team Strategies (IPTS) are supported on three legs that are referred to as its core principles. These principles are a common project incentive scheme, well-defined project success criteria and project control systems and procedures that focus on the project's needs and do not entice local optimisation. Because monetary reward is a short-term motivator for change in personal behaviour, it is a carrot under the donkey's nose for the project management team and the core project participants. As all the core project participants in IPTS now share in the same incentive scheme, their actions will be focussed on the same target because it determines the size of their bonuses / incentives. Project success criteria are their common target. It is therefore important that project success criteria are well defined for all three areas of success namely project management success, product success and relationship success. Traditional project control systems and metrics, which were used to measure the progress of the project, measure progress in isolation because they do not consider the overall need of the project. Local optimisation like tons steel erected per hour may occur because that is how managers on the project are assessed, however, that is not in the interest of the project. IPTS measurement systems focus on what is in the interest of the project and use performance drivers like critical chain and balanced scorecards differently to entice the required behaviour.
综合项目团队策略的视角
IPTS的目的是将核心项目参与者(20%的项目参与者负责对项目成功的80%的影响)团结在一个共同的目标上,这样他们就能专注于项目的利益,而不是他们公司的利益或局部优化。像三脚架一样,集成项目团队战略(IPTS)由三条腿支撑,这三条腿被称为其核心原则。这些原则是一个共同的项目激励计划,明确的项目成功标准和项目控制系统和程序,重点是项目的需要,而不是吸引局部优化。由于金钱奖励是改变个人行为的短期激励因素,因此对于项目管理团队和核心项目参与者来说,它是驴鼻子下的胡萝卜。由于IPTS的所有核心项目参与者现在都分享同一个激励计划,他们的行动将集中在同一个目标上,因为这决定了他们的奖金/奖励的大小。项目成功标准是他们的共同目标。因此,为成功的三个方面,即项目管理的成功、产品的成功和关系的成功,明确定义项目成功的标准是很重要的。传统的项目控制系统和度量是用来度量项目进度的,它们是孤立地度量进度的,因为它们没有考虑项目的整体需求。可能会出现局部优化,例如每小时建造吨钢,因为这是评估项目管理人员的方式,然而,这并不符合项目的利益。IPTS测量系统关注项目的利益,并以不同的方式使用关键链和平衡计分卡等绩效驱动因素来吸引所需的行为。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信