{"title":"Integrating an MPD System on a Jack-Up Rig; Why You Should and How You Can","authors":"Jason Polkinghorne, Michael Cadd, R. Graham, Emil Stoian, Richard E. Sandell, Jason Nugent","doi":"10.2118/206395-ms","DOIUrl":null,"url":null,"abstract":"\n The benefits of Managed Pressure Drilling are well understood in the drilling industry, but until now, they have never been integrated into a Jack-Up rig. For a UK North Sea HPHT campaign, the Drilling Contractor, Operator and MPD Service Provider collaborated for what is believed to be the World's first fully integrated, permanently installed MPD system for a Jack-Up, capable of drilling the most challenging narrow-margin HPHT wells.\n Overcoming the perceived complexity and cost of MPD are common obstacles. Integrating MPD systems into jack-up rigs addresses both challenges by simplifying logistics planning and operations and reducing costs. Putting MPD at the heart of the rig's drilling system offers a wealth of advantages to both the Operator and Drilling Contractor and provides ‘MPD on demand’ for all operations undertaken from the rig.","PeriodicalId":301091,"journal":{"name":"Day 3 Thu, September 16, 2021","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, September 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206395-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The benefits of Managed Pressure Drilling are well understood in the drilling industry, but until now, they have never been integrated into a Jack-Up rig. For a UK North Sea HPHT campaign, the Drilling Contractor, Operator and MPD Service Provider collaborated for what is believed to be the World's first fully integrated, permanently installed MPD system for a Jack-Up, capable of drilling the most challenging narrow-margin HPHT wells. Overcoming the perceived complexity and cost of MPD are common obstacles. Integrating MPD systems into jack-up rigs addresses both challenges by simplifying logistics planning and operations and reducing costs. Putting MPD at the heart of the rig's drilling system offers a wealth of advantages to both the Operator and Drilling Contractor and provides ‘MPD on demand’ for all operations undertaken from the rig.
自升式钻井平台MPD系统集成为什么你应该和如何做
在钻井行业中,控压钻井的优势是众所周知的,但直到现在,它们还没有被集成到自升式钻井平台中。在英国北海的一次高温高压钻井作业中,钻井承包商、作业者和MPD服务提供商合作开发了世界上第一个完全集成的、永久安装的自升式MPD系统,能够钻井最具挑战性的窄边际高温高压井。克服MPD的复杂性和成本是常见的障碍。将MPD系统集成到自升式钻井平台中,通过简化物流规划和操作,降低成本,解决了这两个挑战。将MPD作为钻机钻井系统的核心,为作业者和钻井承包商带来了诸多优势,并为钻机上的所有作业提供了“MPD随需而动”。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信