{"title":"Integrating an MPD System on a Jack-Up Rig; Why You Should and How You Can","authors":"Jason Polkinghorne, Michael Cadd, R. Graham, Emil Stoian, Richard E. Sandell, Jason Nugent","doi":"10.2118/206395-ms","DOIUrl":null,"url":null,"abstract":"\n The benefits of Managed Pressure Drilling are well understood in the drilling industry, but until now, they have never been integrated into a Jack-Up rig. For a UK North Sea HPHT campaign, the Drilling Contractor, Operator and MPD Service Provider collaborated for what is believed to be the World's first fully integrated, permanently installed MPD system for a Jack-Up, capable of drilling the most challenging narrow-margin HPHT wells.\n Overcoming the perceived complexity and cost of MPD are common obstacles. Integrating MPD systems into jack-up rigs addresses both challenges by simplifying logistics planning and operations and reducing costs. Putting MPD at the heart of the rig's drilling system offers a wealth of advantages to both the Operator and Drilling Contractor and provides ‘MPD on demand’ for all operations undertaken from the rig.","PeriodicalId":301091,"journal":{"name":"Day 3 Thu, September 16, 2021","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, September 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206395-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The benefits of Managed Pressure Drilling are well understood in the drilling industry, but until now, they have never been integrated into a Jack-Up rig. For a UK North Sea HPHT campaign, the Drilling Contractor, Operator and MPD Service Provider collaborated for what is believed to be the World's first fully integrated, permanently installed MPD system for a Jack-Up, capable of drilling the most challenging narrow-margin HPHT wells.
Overcoming the perceived complexity and cost of MPD are common obstacles. Integrating MPD systems into jack-up rigs addresses both challenges by simplifying logistics planning and operations and reducing costs. Putting MPD at the heart of the rig's drilling system offers a wealth of advantages to both the Operator and Drilling Contractor and provides ‘MPD on demand’ for all operations undertaken from the rig.