{"title":"Construction planning and scheduling of a precast house extension using a multi-objective genetic algorithm and 4D building information modelling","authors":"Sarah Alyatama, R. Al-Sabah","doi":"10.5339/connect.2023.1","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":121009,"journal":{"name":"QScience Connect","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"QScience Connect","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5339/connect.2023.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}