{"title":"Optimizing grid infrastructure with site-flexible, fuel-free compressed air energy storage","authors":"Richard D. Brody","doi":"10.1109/TDC.2014.6863149","DOIUrl":null,"url":null,"abstract":"The ever-growing overall demand for electricity combined with the increasingly variable supply of that key energy resource presents fundamental challenges to established processes for planning, building, and operating grid infrastructure. The issue extends beyond generation, as transmission planners struggle to site new lines in an environment of increasing political and societal opposition, while simultaneously meeting the challenge of managing unschedulable energy sources. Further, in certain areas with limited long-term demand growth it can be difficult to justify capital investment. Site-flexible energy storage offers a solution to both problems: transforming intermittent renewables into schedulable sources of clean energy, while cost-efficiently enhancing the utilization of existing transmission infrastructure.","PeriodicalId":161074,"journal":{"name":"2014 IEEE PES T&D Conference and Exposition","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE PES T&D Conference and Exposition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2014.6863149","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The ever-growing overall demand for electricity combined with the increasingly variable supply of that key energy resource presents fundamental challenges to established processes for planning, building, and operating grid infrastructure. The issue extends beyond generation, as transmission planners struggle to site new lines in an environment of increasing political and societal opposition, while simultaneously meeting the challenge of managing unschedulable energy sources. Further, in certain areas with limited long-term demand growth it can be difficult to justify capital investment. Site-flexible energy storage offers a solution to both problems: transforming intermittent renewables into schedulable sources of clean energy, while cost-efficiently enhancing the utilization of existing transmission infrastructure.
优化电网基础设施,现场灵活,无燃料压缩空气储能
不断增长的电力总需求与日益变化的关键能源供应相结合,对既定的规划、建设和运营电网基础设施的过程提出了根本性的挑战。这个问题不仅仅局限于发电,输电规划人员在政治和社会反对声音日益高涨的环境下,努力选址新线路,同时还要应对管理不可调度能源的挑战。此外,在某些长期需求增长有限的领域,很难证明资本投资是合理的。地点灵活的能源存储为这两个问题提供了解决方案:将间歇性可再生能源转化为可调度的清洁能源,同时以经济高效的方式提高现有输电基础设施的利用率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信