Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project

Shilvy Aghniya, Saihul Anwar
{"title":"Analysis Of Construction Management On The Ashley Hotel Central Jakarta Development Project","authors":"Shilvy Aghniya, Saihul Anwar","doi":"10.33603/JGST.V3I2.2387","DOIUrl":null,"url":null,"abstract":"Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally. Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM). Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00. Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/JGST.V3I2.2387","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction Management is the process of implementing management functions (Planning, Organizing, Actuating and Controlling) systematically on a project by using existing resources effectively and efficiently in order to achieve project objectives optimally. Analysis of Construction Management on the Ashley Hotel Central Jakarta Development Project isstartingfromtheanalysisofimplementationmethod,thecalculationoftheworkvolume,thecalculation of the needs of labor, material, and equipment, the calculation of the budget plan, and the time and cost control project with Barchart, S-Curve and Critical Path Method(CPM). Based on the analysis that has been done with Barchart, S-Curve and CPM, the construction of Ashley Hotel takes 69 weeks with an estimated cost of Rp. 39.091.299.600,00. Keyword : Construction Management, Barchart, S-Curve, CPM (Critical Path Method).
雅加达中心阿什利酒店开发项目施工管理分析
施工管理是通过有效和高效地利用现有资源,系统地对项目实施管理职能(计划、组织、执行和控制),以最佳地实现项目目标的过程。对雅加达中心阿什利酒店开发项目的施工管理分析,从实施方法分析、工程量计算、人工、材料、设备需求计算、预算计划计算,以及运用巴图、s曲线和关键路径法(CPM)对项目进行时间和成本控制等方面展开。根据Barchart, S-Curve和CPM的分析,Ashley Hotel的建设需要69周,预计成本为Rp. 39.091.299.60万。关键词:施工管理,柱状图,s曲线,关键路径法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信