{"title":"ILP-based scheduling for malleable fork-join tasks","authors":"Kaname Shimada, Ittetsu Taniguchi, H. Tomiyama","doi":"10.1145/3373400.3373403","DOIUrl":null,"url":null,"abstract":"This paper studies scheduling of malleable fork-join tasks. In our scheduling problem, each task can be partitioned into multiple sub-tasks, and the sub-tasks are scheduled independently. The optimal number of sub-tasks is determined during scheduling simultaneously. This paper formulates the scheduling problem as an integer linear programming problem.","PeriodicalId":447904,"journal":{"name":"SIGBED Rev.","volume":"100 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SIGBED Rev.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3373400.3373403","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
This paper studies scheduling of malleable fork-join tasks. In our scheduling problem, each task can be partitioned into multiple sub-tasks, and the sub-tasks are scheduled independently. The optimal number of sub-tasks is determined during scheduling simultaneously. This paper formulates the scheduling problem as an integer linear programming problem.