From early to late formal requirements: a process-control case study

E. Dubois, Michaël Petit, Eric Yu
{"title":"From early to late formal requirements: a process-control case study","authors":"E. Dubois, Michaël Petit, Eric Yu","doi":"10.1109/IWSSD.1998.667917","DOIUrl":null,"url":null,"abstract":"In this paper we consider three distinct and connected modelling activities at the Requirements Engineering (RE) level. Within the context of reactive systems, we suggest how these three activities can be supported by the use of appropriate formal languages, namely Kaos, AlbertII and Timed Automata. The i* framework is used for linking the various formal models and for providing a \"high level\" model in terms of which organizational issues are captured. A small process control example is used to illustrate the proposed approach.","PeriodicalId":431074,"journal":{"name":"Proceedings Ninth International Workshop on Software Specification and Design","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1998-04-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"54","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Ninth International Workshop on Software Specification and Design","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IWSSD.1998.667917","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 54

Abstract

In this paper we consider three distinct and connected modelling activities at the Requirements Engineering (RE) level. Within the context of reactive systems, we suggest how these three activities can be supported by the use of appropriate formal languages, namely Kaos, AlbertII and Timed Automata. The i* framework is used for linking the various formal models and for providing a "high level" model in terms of which organizational issues are captured. A small process control example is used to illustrate the proposed approach.
从早期到晚期的正式需求:过程控制案例研究
在本文中,我们考虑了需求工程(RE)级别上的三个不同且相互关联的建模活动。在反应性系统的背景下,我们建议如何通过使用适当的形式语言,即Kaos, AlbertII和定时自动机来支持这三个活动。i*框架用于连接各种正式模型,并提供捕获组织问题的“高级”模型。用一个小的过程控制实例来说明所提出的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信