Analysis tools for stormwater controls on construction sites

J. Ock, R. Issa, I. Flood
{"title":"Analysis tools for stormwater controls on construction sites","authors":"J. Ock, R. Issa, I. Flood","doi":"10.1109/WSC.2016.7822364","DOIUrl":null,"url":null,"abstract":"Stormwater discharges from construction activities can have significant impact on water quality by contributing sediments and pollutants to waterbodies. The National Pollutant Discharge Elimination System (NPDES) for most States and the Construction General Permit (CGP) for a few states in the U.S. require the development and implementation of Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMPs), which should contain storm water collection and discharge points, and drainage patterns across construction projects. Generally, erosion and sedimentation from disturbed construction sites need to be controled before and after construction. This regulatory compliance frequently results in schedule delays or decreased productivity at the beginning of construction process and violations or failure to implement stormwater management on construction sites increases construction costs. Therefore, an appropriate SWPPP needs to be developed at the planning phase. This study explores the feasibility of utilizing BIM tools for SWPPP and BMPs developments.","PeriodicalId":367269,"journal":{"name":"2016 Winter Simulation Conference (WSC)","volume":"125 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 Winter Simulation Conference (WSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2016.7822364","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Stormwater discharges from construction activities can have significant impact on water quality by contributing sediments and pollutants to waterbodies. The National Pollutant Discharge Elimination System (NPDES) for most States and the Construction General Permit (CGP) for a few states in the U.S. require the development and implementation of Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMPs), which should contain storm water collection and discharge points, and drainage patterns across construction projects. Generally, erosion and sedimentation from disturbed construction sites need to be controled before and after construction. This regulatory compliance frequently results in schedule delays or decreased productivity at the beginning of construction process and violations or failure to implement stormwater management on construction sites increases construction costs. Therefore, an appropriate SWPPP needs to be developed at the planning phase. This study explores the feasibility of utilizing BIM tools for SWPPP and BMPs developments.
建筑地盘雨水管制的分析工具
建筑活动排放的雨水会对水体产生沉积物和污染物,从而对水质产生重大影响。美国大多数州的国家污染物排放消除系统(NPDES)和少数州的建筑一般许可证(CGP)要求制定和实施雨水污染预防计划(SWPPP)和最佳管理实践(BMPs),其中应包括雨水收集和排放点,以及整个建筑项目的排水模式。一般来说,受扰动的建筑工地的侵蚀和沉积需要在施工前后进行控制。这种法规遵从性经常导致施工过程开始时进度延迟或生产力下降,并且违反或未能在施工现场实施雨水管理增加了施工成本。因此,需要在规划阶段制定适当的SWPPP。本研究探讨了在SWPPP和bmp开发中使用BIM工具的可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信