{"title":"Tackling the problem","authors":"T. Kippenberger","doi":"10.1108/EUM0000000006644","DOIUrl":null,"url":null,"abstract":"Catalogues, that, since 1995‐96 Y2K projects methodology has been developed and widely adopted and covers the following stages: awareness; assessment; inventory and analysis; planning and scheduling; renovation or remediation; validation through internal testing; implementation; and final validation through external testing. States that may IT managers avoid admitting there is a problem until it is too late and that the Y2K problem does not allow for late starters in the area.","PeriodicalId":178456,"journal":{"name":"The Antidote","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Antidote","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/EUM0000000006644","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13
Abstract
Catalogues, that, since 1995‐96 Y2K projects methodology has been developed and widely adopted and covers the following stages: awareness; assessment; inventory and analysis; planning and scheduling; renovation or remediation; validation through internal testing; implementation; and final validation through external testing. States that may IT managers avoid admitting there is a problem until it is too late and that the Y2K problem does not allow for late starters in the area.