A Production Plan Considering Parallel Machines and Deteriorating Effects: Minimizing the Makespan in the Section of Steel Box Girder Processing

Xiao‐hai Yang, Ran Ma
{"title":"A Production Plan Considering Parallel Machines and Deteriorating Effects: Minimizing the Makespan in the Section of Steel Box Girder Processing","authors":"Xiao‐hai Yang, Ran Ma","doi":"10.1142/s0129626423400029","DOIUrl":null,"url":null,"abstract":"With the popularization of energy conservation and emission reduction, amounts of industrial production has taken energy conservation as a goal to achieve. The paper considers an online parallel-batch scheduling problem with deteriorating and incompatible families on identical machines to minimize the makespan, which minimizes the maximum energy consumption of machines. Specifically, the processing time of job [Formula: see text] is defined by an increasing function of its starting time [Formula: see text], i.e., [Formula: see text], where [Formula: see text] is the deterioration rate of job [Formula: see text]. For the problem, we propose an online algorithm with a competitive ratio of [Formula: see text], where [Formula: see text] is the largest deterioration rate in an instance. Furthermore, the paper presents a concise computational study of the numerical experiment to show that our algorithm performs very well in practice of this model.","PeriodicalId":422436,"journal":{"name":"Parallel Process. Lett.","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Parallel Process. Lett.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/s0129626423400029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

With the popularization of energy conservation and emission reduction, amounts of industrial production has taken energy conservation as a goal to achieve. The paper considers an online parallel-batch scheduling problem with deteriorating and incompatible families on identical machines to minimize the makespan, which minimizes the maximum energy consumption of machines. Specifically, the processing time of job [Formula: see text] is defined by an increasing function of its starting time [Formula: see text], i.e., [Formula: see text], where [Formula: see text] is the deterioration rate of job [Formula: see text]. For the problem, we propose an online algorithm with a competitive ratio of [Formula: see text], where [Formula: see text] is the largest deterioration rate in an instance. Furthermore, the paper presents a concise computational study of the numerical experiment to show that our algorithm performs very well in practice of this model.
考虑并行机和劣化效应的生产计划:最小化钢箱梁加工断面的最大完工时间
随着节能减排的普及,大量的工业生产已经把节能作为一个目标来实现。为了使机器的最大能耗最小,研究了同一机器上具有劣化和不相容家族的在线并行批调度问题。具体来说,作业的加工时间[公式:见文]是其开始时间[公式:见文]的递增函数,即[公式:见文],其中[公式:见文]是作业[公式:见文]的劣化率。针对该问题,我们提出了一种竞争比为[Formula: see text]的在线算法,其中[Formula: see text]是一个实例中最大的劣化率。此外,本文还对数值实验进行了简明的计算研究,表明该算法在该模型的实际应用中具有良好的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信