Frontline Maintenance Re-Strategy: Perspective of Cost-Benefit Analysis

Haidar Husein Alfarisi, W. M. N. W M Yaakub, Syifaa Zukhri
{"title":"Frontline Maintenance Re-Strategy: Perspective of Cost-Benefit Analysis","authors":"Haidar Husein Alfarisi, W. M. N. W M Yaakub, Syifaa Zukhri","doi":"10.2523/iptc-22713-ms","DOIUrl":null,"url":null,"abstract":"\n Effective August 2021, Malaysia Assets Reset has launched Clustered Maintenance Planning and Execution (CMPE) department towards value focused asset management. To align with the department aspiration to continually generating optimum cashflow as well as staff upskilling, this study focuses on one of CMPE key result areas, with its main objective is to steer frontline maintenance work practice to value-generation perspective.\n Cost-Benefit Analysis (CBA) process is used in this study to analyze which maintenance tasks to proceed and which to forgo. It is performed by comparing the cost of frontline maintenance versus outsourcing for a maintenance task over a period of time. Elements taking into consideration for the cost calculation are materials, special tools, additional cost required to ensure internal resources competent to perform the job, outsourcing contract rate (on annual basis), and logistics associated costs.\n Currently, CBA assessment has been performed by CMPE on 15 potential maintenance tasks which was previously executed via outsourcing. Based on the cost saving/cost incurred derived from Frontline Maintenance versus outsourcing, 14 of the tasks are classified as cost-effective. Taking into consideration of clustered planning and scheduling, each planner are required to further assess on the perspective of manpower availability and re-strategize on manpower arrangement to execute the maintenance task via frontline maintenance. This CBA assessment not only resulted to an increase of 29% total planned frontline maintenance activities in 2022 versus pool of activities performed in 2021 but also contributed to additional technical skill sets to perform value-added maintenance tasks.\n The assessment via CBA has added value-generation perspective in identifying cost-effective and feasibility of the activities selected. By performing this study, it has supported towards achieving the company End State Aspiration.","PeriodicalId":283978,"journal":{"name":"Day 1 Wed, March 01, 2023","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Wed, March 01, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22713-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Effective August 2021, Malaysia Assets Reset has launched Clustered Maintenance Planning and Execution (CMPE) department towards value focused asset management. To align with the department aspiration to continually generating optimum cashflow as well as staff upskilling, this study focuses on one of CMPE key result areas, with its main objective is to steer frontline maintenance work practice to value-generation perspective. Cost-Benefit Analysis (CBA) process is used in this study to analyze which maintenance tasks to proceed and which to forgo. It is performed by comparing the cost of frontline maintenance versus outsourcing for a maintenance task over a period of time. Elements taking into consideration for the cost calculation are materials, special tools, additional cost required to ensure internal resources competent to perform the job, outsourcing contract rate (on annual basis), and logistics associated costs. Currently, CBA assessment has been performed by CMPE on 15 potential maintenance tasks which was previously executed via outsourcing. Based on the cost saving/cost incurred derived from Frontline Maintenance versus outsourcing, 14 of the tasks are classified as cost-effective. Taking into consideration of clustered planning and scheduling, each planner are required to further assess on the perspective of manpower availability and re-strategize on manpower arrangement to execute the maintenance task via frontline maintenance. This CBA assessment not only resulted to an increase of 29% total planned frontline maintenance activities in 2022 versus pool of activities performed in 2021 but also contributed to additional technical skill sets to perform value-added maintenance tasks. The assessment via CBA has added value-generation perspective in identifying cost-effective and feasibility of the activities selected. By performing this study, it has supported towards achieving the company End State Aspiration.
前线维修再策略:成本效益分析的视角
自2021年8月起,马来西亚资产重置启动了集群维护计划和执行(CMPE)部门,以实现以价值为中心的资产管理。为了配合部门不断产生最佳现金流和提高员工技能的愿望,本研究侧重于CMPE的一个关键成果领域,其主要目标是将一线维修工作实践引导到创造价值的角度。本研究采用成本效益分析(Cost-Benefit Analysis, CBA)方法,分析哪些维修任务应继续进行,哪些应放弃。它是通过在一段时间内比较一线维护与外包维护任务的成本来执行的。计算成本时要考虑的因素包括材料、特殊工具、确保内部资源能够胜任工作所需的额外成本、外包合同率(按年计算)以及物流相关成本。目前,CBA评估已经由CMPE对15项潜在的维护任务进行了评估,这些任务之前是通过外包执行的。根据前线维修与外判服务所节省的成本/产生的成本,有14项工作是具成本效益的。考虑到集群计划和调度,每个计划人员需要进一步评估人力可用性,并重新制定人力安排策略,以通过前线维修执行维修任务。这项CBA评估不仅导致2022年计划的一线维护活动总量比2021年增加了29%,而且还为执行增值维护任务提供了额外的技术技能。通过CBA进行的评估在确定所选活动的成本效益和可行性方面增加了价值产生的角度。通过执行这项研究,它支持实现公司的最终状态愿望。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信