{"title":"NDT Use in Evaluating the Form Removal Time for a Large Diameter Tunnel Concrete Lining","authors":"T. Harrell","doi":"10.14359/3726","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":187965,"journal":{"name":"SP-112: Nondestructive Testing of Concrete","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SP-112: Nondestructive Testing of Concrete","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14359/3726","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}