Power flow and Short circuit of 220 kV Substation using ETAP

Amine Zeggai, F. Benhamida
{"title":"Power flow and Short circuit of 220 kV Substation using ETAP","authors":"Amine Zeggai, F. Benhamida","doi":"10.1109/CAGRE.2019.8713172","DOIUrl":null,"url":null,"abstract":"With increasing load requirements day by day, electric utilities have also grown up to meet the load requirements. The load flow gives us information on bus and branch voltages, active and reactive power, as well as losses in transformers, conductors, cables and the entire system of this substation. Short circuit studies are most needed in a power system in order to properly size the devices, so that they are able to handle short circuit currents. This data is also used to evaluate the correct sizing of protection relays and detection equipment. In this paper, we performed a simulation of 220/63/30 kV the high-voltage substation GHAZAOUET ETAP 16.0.0 using the advanced ETAP software, which solves various problems, such as overloading and live to ensure reliable energy.","PeriodicalId":112293,"journal":{"name":"2019 Algerian Large Electrical Network Conference (CAGRE)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 Algerian Large Electrical Network Conference (CAGRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CAGRE.2019.8713172","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

With increasing load requirements day by day, electric utilities have also grown up to meet the load requirements. The load flow gives us information on bus and branch voltages, active and reactive power, as well as losses in transformers, conductors, cables and the entire system of this substation. Short circuit studies are most needed in a power system in order to properly size the devices, so that they are able to handle short circuit currents. This data is also used to evaluate the correct sizing of protection relays and detection equipment. In this paper, we performed a simulation of 220/63/30 kV the high-voltage substation GHAZAOUET ETAP 16.0.0 using the advanced ETAP software, which solves various problems, such as overloading and live to ensure reliable energy.
用ETAP分析220kv变电站的潮流和短路
随着负荷要求的日益增加,电力公司也在不断发展以满足负荷要求。负载流为我们提供了母线和支路电压、有功和无功功率以及变压器、导体、电缆和变电站整个系统的损耗等信息。短路研究是电力系统中最需要的,以便对设备进行适当的尺寸设计,使其能够处理短路电流。这些数据也用于评估保护继电器和检测设备的正确尺寸。本文利用先进的ETAP软件对220/63/30 kV高压变电站GHAZAOUET ETAP 16.0.0进行仿真,解决了过载、带电等各种问题,保证了电能的可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信