{"title":"IEC view of transient immunity testing 1","authors":"T. Braxton","doi":"10.1109/ISEMC.2017.8078081","DOIUrl":null,"url":null,"abstract":"1 — First things first: work with the customer and define what constitutes a failure in your product; make that part of the test plan. — Check the product category to see if additional immunity tests are required. — Monitor all responses as the tests are executed and document them all. — The goal is to minimize ambiguity and produce a quality product.","PeriodicalId":426924,"journal":{"name":"2017 IEEE International Symposium on Electromagnetic Compatibility & Signal/Power Integrity (EMCSI)","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE International Symposium on Electromagnetic Compatibility & Signal/Power Integrity (EMCSI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEMC.2017.8078081","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
1 — First things first: work with the customer and define what constitutes a failure in your product; make that part of the test plan. — Check the product category to see if additional immunity tests are required. — Monitor all responses as the tests are executed and document them all. — The goal is to minimize ambiguity and produce a quality product.