{"title":"Congestion management in nodal pricing with genetic algorithm","authors":"S. Nabavi, S. Jadid, M. Masoum, A. Kazemi","doi":"10.1109/PEDES.2006.344301","DOIUrl":null,"url":null,"abstract":"Congestion cost allocation is an important issue in congestion management. This paper presents a genetic algorithm (GA) to determine the optimal generation levels in a deregulated market. The main issue is congestion in lines, which limits transfer capability of a system with available generation capacity. Nodal pricing method is used to determine locational marginal price (LMP) of each generator at each bus. Simulation results based on the proposed GA and the Power World Simulator software are presented and compared for 3-bus and 5-bus test systems.","PeriodicalId":262597,"journal":{"name":"2006 International Conference on Power Electronic, Drives and Energy Systems","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"37","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 International Conference on Power Electronic, Drives and Energy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PEDES.2006.344301","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 37
Abstract
Congestion cost allocation is an important issue in congestion management. This paper presents a genetic algorithm (GA) to determine the optimal generation levels in a deregulated market. The main issue is congestion in lines, which limits transfer capability of a system with available generation capacity. Nodal pricing method is used to determine locational marginal price (LMP) of each generator at each bus. Simulation results based on the proposed GA and the Power World Simulator software are presented and compared for 3-bus and 5-bus test systems.
拥塞费用分配是拥塞管理中的一个重要问题。本文提出了一种遗传算法来确定解除管制市场下的最优发电水平。主要的问题是线路堵塞,这限制了系统的传输能力和可用的发电能力。采用节点定价法确定各发电机组在各母线上的位置边际电价。给出了基于遗传算法和Power World Simulator软件的3总线和5总线测试系统的仿真结果,并进行了比较。