R. Bachrach, M. Pool, K. Genovese, J.C. Moran, M. O'Halloran, T. J. Connolly
{"title":"Comparative analysis of 300 mm FAB architectures impact of equipment sets on wafer cost and dynamic performance","authors":"R. Bachrach, M. Pool, K. Genovese, J.C. Moran, M. O'Halloran, T. J. Connolly","doi":"10.1109/ISSM.2001.962992","DOIUrl":null,"url":null,"abstract":"A semiconductor fabricator is a highly complex system that hosts the process tools capable of manufacturing IC product devices based upon their process flows. A typical process flow for a 0.15 /spl mu/m logic process consists of 300 to 400 steps with 22 to 24 mask steps. A variety of equipment sets and organizational architectures are possible for any process flow. The results of a comparative analysis of two such 300 mm FAB architectures are presented in this report. The impact of equipment sets on fab Sizing, Cost, and Performance are described as a function of operating characteristics.","PeriodicalId":356225,"journal":{"name":"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-10-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2001.962992","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A semiconductor fabricator is a highly complex system that hosts the process tools capable of manufacturing IC product devices based upon their process flows. A typical process flow for a 0.15 /spl mu/m logic process consists of 300 to 400 steps with 22 to 24 mask steps. A variety of equipment sets and organizational architectures are possible for any process flow. The results of a comparative analysis of two such 300 mm FAB architectures are presented in this report. The impact of equipment sets on fab Sizing, Cost, and Performance are described as a function of operating characteristics.