Software renewal projects estimation using dynamic calibration

M. T. Baldassarre, D. Caivano, G. Visaggio
{"title":"Software renewal projects estimation using dynamic calibration","authors":"M. T. Baldassarre, D. Caivano, G. Visaggio","doi":"10.1109/ICSM.2003.1235411","DOIUrl":null,"url":null,"abstract":"Effort estimation is a long faced problem, but, in spite of the amount of research spent in this field, it still remains an open issue in the software engineering community. This is true especially in the case of renewal of legacy systems, where the current and well established approaches also fail. This paper presents an application of the method named dynamic calibration for effort estimation of renewal projects together with its experimental validation. The approach satisfies all the requirements of the estimation models. The results obtained by applying dynamic calibration are compared with those obtained with a competitor method: estimation by analogy. The results are shown to be promising although further experimentation on field is needed.","PeriodicalId":141256,"journal":{"name":"International Conference on Software Maintenance, 2003. ICSM 2003. Proceedings.","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Software Maintenance, 2003. ICSM 2003. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSM.2003.1235411","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20

Abstract

Effort estimation is a long faced problem, but, in spite of the amount of research spent in this field, it still remains an open issue in the software engineering community. This is true especially in the case of renewal of legacy systems, where the current and well established approaches also fail. This paper presents an application of the method named dynamic calibration for effort estimation of renewal projects together with its experimental validation. The approach satisfies all the requirements of the estimation models. The results obtained by applying dynamic calibration are compared with those obtained with a competitor method: estimation by analogy. The results are shown to be promising although further experimentation on field is needed.
使用动态校准的软件更新项目评估
工作量评估是一个长期面临的问题,但是,尽管在这个领域花费了大量的研究,它仍然是软件工程社区的一个开放问题。这在更新遗留系统的情况下尤其如此,在这种情况下,当前和完善的方法也失败了。本文介绍了动态标定方法在更新工程工作量估算中的应用,并对其进行了实验验证。该方法满足估计模型的所有要求。并将动态标定的结果与类比估计的结果进行了比较。虽然还需要进一步的现场试验,但结果是有希望的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信