Liang Shen, Yuanyuan Yang, Zhijia Wang, Xiaoxiao Zhang, J. Gu
{"title":"Design on Test Method of Network-Based Intrusion Detection System","authors":"Liang Shen, Yuanyuan Yang, Zhijia Wang, Xiaoxiao Zhang, J. Gu","doi":"10.1109/ICCECT.2012.198","DOIUrl":null,"url":null,"abstract":"Based on the research work of network-based intrusion detection system testing principles and conditions, this paper seeks the solution to unify practical research content and GA/T 403.1-2002 reasonably. Precisely, a more comprehensive and reasonable network-based intrusion detection system testing methodology as well as a complete testing work flow is proposed. Based on these foundations, design and realization of a testing tool is finished. As a result, the problems such as difficult to be tested and compared in the original testing project will be solved.","PeriodicalId":153613,"journal":{"name":"2012 International Conference on Control Engineering and Communication Technology","volume":"57 7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on Control Engineering and Communication Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCECT.2012.198","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Based on the research work of network-based intrusion detection system testing principles and conditions, this paper seeks the solution to unify practical research content and GA/T 403.1-2002 reasonably. Precisely, a more comprehensive and reasonable network-based intrusion detection system testing methodology as well as a complete testing work flow is proposed. Based on these foundations, design and realization of a testing tool is finished. As a result, the problems such as difficult to be tested and compared in the original testing project will be solved.