Research on the Applicability of Localization of DKZ13 Electric Train Traction System on Beijing Subway Line 5

Chang Liu, Dong Wang, Yuchen Wang
{"title":"Research on the Applicability of Localization of DKZ13 Electric Train Traction System on Beijing Subway Line 5","authors":"Chang Liu, Dong Wang, Yuchen Wang","doi":"10.1109/iceert53919.2021.00047","DOIUrl":null,"url":null,"abstract":"The DKZ13 electric train traction system of Beijing Subway Line 5 is manufactured by Hitachi of Japan. With the gradual growth of operation years, the maintenance cost is increasing day by day, and there exist the problem of long supply cycle of spare parts, which causes inconvenience to train maintenance. By optimizing the main circuit design, optimizing the selection of key components, using new technology and new process, the localization alternative development of the original vehicle traction system is carried out, and the localization traction system is tested through type test and main line loading test. The test results show that the system meets the vehicle application requirements, the structural design is reasonable, and the electrical performance is improved.","PeriodicalId":278054,"journal":{"name":"2021 International Conference on Information Control, Electrical Engineering and Rail Transit (ICEERT)","volume":"200 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Information Control, Electrical Engineering and Rail Transit (ICEERT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/iceert53919.2021.00047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The DKZ13 electric train traction system of Beijing Subway Line 5 is manufactured by Hitachi of Japan. With the gradual growth of operation years, the maintenance cost is increasing day by day, and there exist the problem of long supply cycle of spare parts, which causes inconvenience to train maintenance. By optimizing the main circuit design, optimizing the selection of key components, using new technology and new process, the localization alternative development of the original vehicle traction system is carried out, and the localization traction system is tested through type test and main line loading test. The test results show that the system meets the vehicle application requirements, the structural design is reasonable, and the electrical performance is improved.
北京地铁5号线DKZ13型电动列车牵引系统国产化适用性研究
北京地铁5号线DKZ13型电动列车牵引系统由日本日立公司生产。随着运行年限的逐渐增长,维修费用日益增加,且存在备件供应周期长等问题,给列车维修带来不便。通过优化主电路设计,优化关键部件的选用,采用新技术、新工艺,对原车辆牵引系统进行国产化替代开发,并通过型式试验和干线加载试验对国产化牵引系统进行了试验。试验结果表明,该系统满足整车应用要求,结构设计合理,电气性能得到提高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信