Feasibility Study Of PT. XYZ Palm Oil Plantation And Processing Plant

Retno Nur Safitri, I. Gandakusuma
{"title":"Feasibility Study Of PT. XYZ Palm Oil Plantation And Processing Plant","authors":"Retno Nur Safitri, I. Gandakusuma","doi":"10.2991/ICBMR-18.2019.53","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to examine the factors which should be considered in establishing palm oil plantation and processing plant; it analyzes project feasibility and provides project sensitivity and scenario analysis. The study employs descriptive analysis through a literature review, content analysis, observation and interviews. The object of the research is PT. XYZ, companies engaged in the plantation and palm oil industry in Sijunjung Regency, West Sumatra Province. The feasibility criteria for the projected palm oil plantation and construction of processing plant by PT. XYZ are based on the payback period/discounted payback period, net present value, profitability index and internal rate of return. Project for new palm oil plantation are feasible depending on three conditions : base, optimistic and pessimistic conditions, in which the Net Present Value (NPV) is positive. Processing plant construction project are feasible in base and optimistic conditions, but are rejected in pessimistic conditions. Based on the results of the sensitivity analysis, it can be seen that the factor which has the greatest effect on the net present value of new palm oil plantation is the selling value of FFB (Fresh Fruit Bunch). The factors that have the greatest effect on the net present value of palm oil processing plant construction are the selling points of CPO (Crude Palm Oil) and PKO (Palm Kernel Oil).","PeriodicalId":285535,"journal":{"name":"Proceedings of the 12th International Conference on Business and Management Research (ICBMR 2018)","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 12th International Conference on Business and Management Research (ICBMR 2018)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/ICBMR-18.2019.53","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of this research is to examine the factors which should be considered in establishing palm oil plantation and processing plant; it analyzes project feasibility and provides project sensitivity and scenario analysis. The study employs descriptive analysis through a literature review, content analysis, observation and interviews. The object of the research is PT. XYZ, companies engaged in the plantation and palm oil industry in Sijunjung Regency, West Sumatra Province. The feasibility criteria for the projected palm oil plantation and construction of processing plant by PT. XYZ are based on the payback period/discounted payback period, net present value, profitability index and internal rate of return. Project for new palm oil plantation are feasible depending on three conditions : base, optimistic and pessimistic conditions, in which the Net Present Value (NPV) is positive. Processing plant construction project are feasible in base and optimistic conditions, but are rejected in pessimistic conditions. Based on the results of the sensitivity analysis, it can be seen that the factor which has the greatest effect on the net present value of new palm oil plantation is the selling value of FFB (Fresh Fruit Bunch). The factors that have the greatest effect on the net present value of palm oil processing plant construction are the selling points of CPO (Crude Palm Oil) and PKO (Palm Kernel Oil).
PT. XYZ棕榈油种植园和加工厂的可行性研究
本研究的目的是探讨建立棕榈油种植园和加工厂应考虑的因素;分析项目可行性,提供项目敏感性和情景分析。本研究采用文献分析法、内容分析法、观察法和访谈法进行描述性分析。该研究的对象是PT. XYZ,在西苏门答腊省Sijunjung Regency从事种植园和棕榈油行业的公司。PT. XYZ计划的棕榈油种植园和加工厂建设的可行性标准基于投资回收期/贴现投资回收期、净现值、盈利能力指数和内部收益率。新建棕榈油种植园项目的可行性取决于三个条件:基础条件、乐观条件和悲观条件,其中净现值(NPV)为正。加工厂建设项目在基础和乐观条件下是可行的,在悲观条件下是被拒绝的。根据敏感性分析的结果可以看出,对新棕榈油种植园净现值影响最大的因素是FFB (Fresh Fruit Bunch)的销售价值。对棕榈油加工厂建设净现值影响最大的因素是CPO(粗棕榈油)和PKO(棕榈仁油)的卖点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信