The Risk Allocation Method Based on Fuzzy Integrated Evaluation of Construction Projects

Yun-li Gao, Lei Jiang
{"title":"The Risk Allocation Method Based on Fuzzy Integrated Evaluation of Construction Projects","authors":"Yun-li Gao, Lei Jiang","doi":"10.1109/ICRMEM.2008.28","DOIUrl":null,"url":null,"abstract":"Construction project risk allocation is one of the problems which all the project participants concerning about. On the basis of studying the principles of project risk allocation, this paper establish the evaluating indicator that evaluates the risk carrying capacity of all the project participants. The evaluating factor set in the risk allocation is determined, the integrated risk allocation coefficients of all project participants are calculated in the method of fuzzy integrated evaluation, and the method of the risk loss allocation of each project participant is proposed. This method clears the risk responsibility of each project participant, and points out a new train of thought in the field of quantitative analysis research of project risk allocation.","PeriodicalId":430801,"journal":{"name":"2008 International Conference on Risk Management & Engineering Management","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Conference on Risk Management & Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRMEM.2008.28","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

Construction project risk allocation is one of the problems which all the project participants concerning about. On the basis of studying the principles of project risk allocation, this paper establish the evaluating indicator that evaluates the risk carrying capacity of all the project participants. The evaluating factor set in the risk allocation is determined, the integrated risk allocation coefficients of all project participants are calculated in the method of fuzzy integrated evaluation, and the method of the risk loss allocation of each project participant is proposed. This method clears the risk responsibility of each project participant, and points out a new train of thought in the field of quantitative analysis research of project risk allocation.
基于模糊综合评价的建设项目风险分配方法
建设项目风险分配是各项目参与方共同关心的问题之一。在研究项目风险分配原则的基础上,建立了评价项目各参与方风险承担能力的评价指标。确定了风险分配中的评价因子集,采用模糊综合评价法计算了各项目参与者的综合风险分配系数,提出了各项目参与者的风险损失分配方法。该方法明确了项目各参与方的风险责任,为项目风险分配定量分析研究领域提出了新的思路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信