Research on the whole process intelligent management method of building construction based on BIM Technology

Haibo Fan
{"title":"Research on the whole process intelligent management method of building construction based on BIM Technology","authors":"Haibo Fan","doi":"10.1109/icvris51417.2020.00035","DOIUrl":null,"url":null,"abstract":"In order to solve the problem of poor effect and long time-consuming of current intelligent management of building construction, an intelligent management method of the whole process of building construction based on BIM Technology is proposed. Lean the construction management mode, construct the three-dimensional virtual model of the construction project, optimize the intelligent management process of the whole construction process, and improve the intelligent management method of the whole construction process. Finally, the experiment proves that the BIM based intelligent management method in the whole process of building construction has a good effect in the practical application process, which can effectively solve the problem of long-time intelligent management in the whole process of building construction and fully meet the research requirements.","PeriodicalId":162549,"journal":{"name":"2020 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)","volume":"114 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Virtual Reality and Intelligent Systems (ICVRIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/icvris51417.2020.00035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In order to solve the problem of poor effect and long time-consuming of current intelligent management of building construction, an intelligent management method of the whole process of building construction based on BIM Technology is proposed. Lean the construction management mode, construct the three-dimensional virtual model of the construction project, optimize the intelligent management process of the whole construction process, and improve the intelligent management method of the whole construction process. Finally, the experiment proves that the BIM based intelligent management method in the whole process of building construction has a good effect in the practical application process, which can effectively solve the problem of long-time intelligent management in the whole process of building construction and fully meet the research requirements.
基于BIM技术的建筑施工全过程智能化管理方法研究
为了解决当前建筑施工智能化管理效果差、耗时长的问题,提出了一种基于BIM技术的建筑施工全过程智能化管理方法。借鉴施工管理模式,构建施工项目的三维虚拟模型,优化施工全过程的智能管理流程,完善施工全过程的智能管理方法。最后,实验证明,基于BIM的建筑施工全过程智能管理方法在实际应用过程中效果良好,可以有效解决建筑施工全过程智能管理时间过长的问题,完全满足研究要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信