Availability of utility-scale photovoltaic power plants

Kirby Hunt, Anthony Blekicki, Robert Callery
{"title":"Availability of utility-scale photovoltaic power plants","authors":"Kirby Hunt, Anthony Blekicki, Robert Callery","doi":"10.1109/PVSC.2015.7355976","DOIUrl":null,"url":null,"abstract":"Understanding the current state of availability of Utility-Scale photovoltaic power plants is essential for developing and financing these projects. An energy based availability metric suitable for Utility-Scale Photovoltaic power plants termed “Effective Availability” is described. The calculation methodology is discussed along with the merits of the metric. The Effective Availability of a fleet of 27 utility scale power plants is presented for a 5 year period. The factors affecting availability are discussed.","PeriodicalId":427842,"journal":{"name":"2015 IEEE 42nd Photovoltaic Specialist Conference (PVSC)","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE 42nd Photovoltaic Specialist Conference (PVSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PVSC.2015.7355976","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

Understanding the current state of availability of Utility-Scale photovoltaic power plants is essential for developing and financing these projects. An energy based availability metric suitable for Utility-Scale Photovoltaic power plants termed “Effective Availability” is described. The calculation methodology is discussed along with the merits of the metric. The Effective Availability of a fleet of 27 utility scale power plants is presented for a 5 year period. The factors affecting availability are discussed.
公用事业规模的光伏电站的可用性
了解公用事业规模光伏电站的可用性现状对于开发和资助这些项目至关重要。描述了一种适用于公用事业规模光伏电站的基于能量的可用性度量,称为“有效可用性”。讨论了计算方法以及度量的优点。提出了一个由27个公用事业规模的发电厂组成的机队的5年有效可用性。讨论了影响可用性的因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信