PENGELOLAAN RISIKO PEMBANGUNAN JALAN TOL SERPONG – CINERE

Dendi Purwana
{"title":"PENGELOLAAN RISIKO PEMBANGUNAN JALAN TOL SERPONG – CINERE","authors":"Dendi Purwana","doi":"10.25105/cesd.v3i2.6508","DOIUrl":null,"url":null,"abstract":"Serpong - Cinere Toll Road which is being built has a 10.14 km long road that connects South Tengerang City Banten Province with Depok City West Java Province is part of the Jakarta Outer Ring Toll Road 2, which is expected to make it easier for motorists from Jabodetabek which will go to the Airport Soekarno-Hatta International and Jakarta or vice versa. Serpong - Cinere toll road development in its implementation is also possible to carry risks that must be taken seriously. This is related to the impact of risks that arise that can hinder and harm the project implementers in terms of cost, time, quality and scope of work. To minimize this risk, it is necessary to apply risk management in its implementation. Related to this, the study was conducted to find out the picture of risk management in the implementation of Serpong - Cinere toll road construction. This research used a descriptive qualitative research design with a case study method through a survey strategy using a questionnaire as a research instrument. After the results of the questionnaire are obtained, the next step is to arrange the importance level of risk to find out which risks have the most potential to hamper the process of carrying out the work. Furthermore, the Risk Breakdown Structure is analyzed based on the opinion of the respondents to find out what actions are taken to overcome the dominant risks which of course have a large influence on the completion of a job. The next step is the allocation of risk ownership, especially risks in the dominant category so that each party responsible can exercise the best control. The results showed that 40 risks (88.89%) of the 45 risks identified in the implementation of the Serpong - Cinere toll road construction project were included in the category of dominant risk that could potentially hamper work in terms of time, quality and cost. The largest risk ownership with the Serpong - Cinere toll road development project is owned by the Implementing Contractor at 59.38% risk, Owner at 31.25% and Supervisory Consultant at 9.38%.","PeriodicalId":103613,"journal":{"name":"INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/cesd.v3i2.6508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Serpong - Cinere Toll Road which is being built has a 10.14 km long road that connects South Tengerang City Banten Province with Depok City West Java Province is part of the Jakarta Outer Ring Toll Road 2, which is expected to make it easier for motorists from Jabodetabek which will go to the Airport Soekarno-Hatta International and Jakarta or vice versa. Serpong - Cinere toll road development in its implementation is also possible to carry risks that must be taken seriously. This is related to the impact of risks that arise that can hinder and harm the project implementers in terms of cost, time, quality and scope of work. To minimize this risk, it is necessary to apply risk management in its implementation. Related to this, the study was conducted to find out the picture of risk management in the implementation of Serpong - Cinere toll road construction. This research used a descriptive qualitative research design with a case study method through a survey strategy using a questionnaire as a research instrument. After the results of the questionnaire are obtained, the next step is to arrange the importance level of risk to find out which risks have the most potential to hamper the process of carrying out the work. Furthermore, the Risk Breakdown Structure is analyzed based on the opinion of the respondents to find out what actions are taken to overcome the dominant risks which of course have a large influence on the completion of a job. The next step is the allocation of risk ownership, especially risks in the dominant category so that each party responsible can exercise the best control. The results showed that 40 risks (88.89%) of the 45 risks identified in the implementation of the Serpong - Cinere toll road construction project were included in the category of dominant risk that could potentially hamper work in terms of time, quality and cost. The largest risk ownership with the Serpong - Cinere toll road development project is owned by the Implementing Contractor at 59.38% risk, Owner at 31.25% and Supervisory Consultant at 9.38%.
SERPONG road建设风险管理——CINERE
正在建设的Serpong - Cinere收费公路有10.14公里长,连接南腾杰朗市万丹省和西爪哇省德波市,是雅加达外环收费公路2的一部分,预计这将使驾驶者更容易从Jabodetabek前往苏加诺-哈达国际机场和雅加达,反之亦然。二邦-辛内雷收费公路发展在其实施中也可能带来风险,必须认真对待。这与可能在成本、时间、质量和工作范围方面阻碍和损害项目执行者的风险的影响有关。为了最小化这种风险,有必要在其实施中应用风险管理。与此相关,本研究旨在了解二邦-辛内雷收费公路建设实施过程中的风险管理情况。本研究采用描述性定性研究设计与案例研究方法,通过使用问卷作为研究工具的调查策略。在获得调查问卷的结果后,下一步是安排风险的重要程度,以找出哪些风险最有可能阻碍工作的开展过程。此外,根据受访者的意见分析了风险分解结构,以找出采取什么行动来克服当然对完成工作有很大影响的主要风险。下一步是风险所有权的分配,特别是优势类别的风险,使每个责任方都能行使最佳控制。结果表明,在Serpong - Cinere收费公路建设项目实施过程中确定的45个风险中,有40个风险(88.89%)被列入可能在时间、质量和成本方面阻碍工作的主要风险类别。Serpong - Cinere收费公路开发项目的最大风险所有权归实施承包商所有,风险为59.38%,业主为31.25%,监督顾问为9.38%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信