Edric Wijaya, Petrus Haryanto Wibowo, Usmanul Hayadi Umar
{"title":"Analisa terhadap Penerapan Timeframe pada Perumahan Winner Flower House Punggur","authors":"Edric Wijaya, Petrus Haryanto Wibowo, Usmanul Hayadi Umar","doi":"10.37253/jcep.v3i1.1251","DOIUrl":null,"url":null,"abstract":"This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. This study aims to estimate the time for material procurement based on the time schedule for the construction project of the Punggur Flower House Winner. The method used to determine the estimated time is the conventional method, where the scheduling process is the scheduling process where the measurements are taken, in planning meetings, in measuring, and making scheduling times more regular and systematic. This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. The estimated work plan for this project is 52 weeks and the realization of this project is 52 weeks. Thus it can be concluded that the processing time until the completion of the work is not delayed.","PeriodicalId":102190,"journal":{"name":"Journal of Civil Engineering and Planning","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37253/jcep.v3i1.1251","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. This study aims to estimate the time for material procurement based on the time schedule for the construction project of the Punggur Flower House Winner. The method used to determine the estimated time is the conventional method, where the scheduling process is the scheduling process where the measurements are taken, in planning meetings, in measuring, and making scheduling times more regular and systematic. This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. The estimated work plan for this project is 52 weeks and the realization of this project is 52 weeks. Thus it can be concluded that the processing time until the completion of the work is not delayed.