The assessment, strengthening and widening of Thames Bray Bridge

D. Collings
{"title":"The assessment, strengthening and widening of Thames Bray Bridge","authors":"D. Collings","doi":"10.2749/ghent.2021.0109","DOIUrl":null,"url":null,"abstract":"The original Thames Bray Bridge was constructed between 1939 and 1961. It consists of a 112m long 82m span bridge. It was one of the UK’s first welded, stiffened, profiled plate girder bridge with a concrete deck connected with shear connectors. The bridge has undergone a number of inspections, assessments, strengthening and stiffening over the years. In 2015 planning for the upgrading of the highway to Smart Motorway status began. At Thames Bray Bridge there are no hard shoulders and so widening of the bridge was required. This paper outlines the strength assessment of the bridge, the assessment of resilience from failure of ties and of increased river flows due to climate change. It outlines the additional refined assessments carried out to more realistically estimate the capacity of the bridge. The paper outlines the local strengthening and the new asymmetric widening design that visually followed closely the original bridge.","PeriodicalId":162435,"journal":{"name":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/ghent.2021.0109","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The original Thames Bray Bridge was constructed between 1939 and 1961. It consists of a 112m long 82m span bridge. It was one of the UK’s first welded, stiffened, profiled plate girder bridge with a concrete deck connected with shear connectors. The bridge has undergone a number of inspections, assessments, strengthening and stiffening over the years. In 2015 planning for the upgrading of the highway to Smart Motorway status began. At Thames Bray Bridge there are no hard shoulders and so widening of the bridge was required. This paper outlines the strength assessment of the bridge, the assessment of resilience from failure of ties and of increased river flows due to climate change. It outlines the additional refined assessments carried out to more realistically estimate the capacity of the bridge. The paper outlines the local strengthening and the new asymmetric widening design that visually followed closely the original bridge.
泰晤士河布雷大桥的评估、加固和加宽
最初的泰晤士河布雷桥建于1939年至1961年之间。它由一座112米长、82米跨度的桥组成。这是英国第一个焊接,加强,异形板梁桥与混凝土甲板与剪切连接器连接。多年来,这座桥经历了多次检查、评估、加固和加固。2015年,开始对该高速公路进行智能高速公路升级规划。泰晤士河布雷桥没有坚固的桥肩,因此需要加宽桥梁。本文概述了桥梁的强度评估,从破坏的恢复力评估和气候变化引起的河流流量增加。它概述了为更实际地估计桥梁的能力而进行的额外的精确评估。本文概述了局部加固和新的不对称加宽设计,在视觉上与原桥密切相关。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信