{"title":"Monitoring of Borjomi deposit of carbon dioxide mineral water as the informational basis for the study and revaluation of reserves","authors":"I. N. Sekerina, И Н Секерина","doi":"10.31857/S0869-78092019383-89-10852","DOIUrl":null,"url":null,"abstract":"The results of trial production operation in the Central site of Borjomi mineral water deposit during 2015-2018 are analyzed in this article as an example of using monitoring data for the substantiation of water intake optimal scheme. As a result of work at existing bottling plants, the selection of optimal pumping rates for wells was carried out in several stages. The regime analysis identified three hydrodynamic periods: irregular variable water withdrawal, forced operation conditions of wells, and balanced operations. Water level stabilization in the last operation period with the total water withdrawal 282 m3/day was a base for the water reserves revaluation.","PeriodicalId":309934,"journal":{"name":"Геоэкология. Инженерная геология. Гидрогеология. Геокриология","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Геоэкология. Инженерная геология. Гидрогеология. Геокриология","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31857/S0869-78092019383-89-10852","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The results of trial production operation in the Central site of Borjomi mineral water deposit during 2015-2018 are analyzed in this article as an example of using monitoring data for the substantiation of water intake optimal scheme. As a result of work at existing bottling plants, the selection of optimal pumping rates for wells was carried out in several stages. The regime analysis identified three hydrodynamic periods: irregular variable water withdrawal, forced operation conditions of wells, and balanced operations. Water level stabilization in the last operation period with the total water withdrawal 282 m3/day was a base for the water reserves revaluation.