{"title":"Worker Safety Considerations for Deployment of Mobile Disconnect Switches on Transmission Lines","authors":"J. Khan, M. Armstrong, A. Moshref","doi":"10.1109/CCECE47787.2020.9255735","DOIUrl":null,"url":null,"abstract":"Mobile disconnect switches allow electrical isolation on high voltage transmission lines where stationary switches are not available, or special switching is required. In particular, dropping/picking part of a line and loop switching are two key applications of mobile switches. These switches are used in live-line environment. Therefore, several worker safety considerations must be taken into account prior to their deployment. Electrical clearance, grounding design, switch duty calculation and switching sequence - all needs to be assessed. This article provides a set of simplified methods for initial calculations, and an example of real-world deployment where many of these issues are addressed.","PeriodicalId":296506,"journal":{"name":"2020 IEEE Canadian Conference on Electrical and Computer Engineering (CCECE)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE Canadian Conference on Electrical and Computer Engineering (CCECE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CCECE47787.2020.9255735","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Mobile disconnect switches allow electrical isolation on high voltage transmission lines where stationary switches are not available, or special switching is required. In particular, dropping/picking part of a line and loop switching are two key applications of mobile switches. These switches are used in live-line environment. Therefore, several worker safety considerations must be taken into account prior to their deployment. Electrical clearance, grounding design, switch duty calculation and switching sequence - all needs to be assessed. This article provides a set of simplified methods for initial calculations, and an example of real-world deployment where many of these issues are addressed.