Prevention and Resolution of Construction Claims

R. Wilson
{"title":"Prevention and Resolution of Construction Claims","authors":"R. Wilson","doi":"10.1061/JCCEAZ.0001052","DOIUrl":null,"url":null,"abstract":"The owner and architect/engineer's roles in the prevention and resolution of construction claims are examined. A carefully written contract is invaluable in the prevention of a claim. Important aspects of construction contracts are presented, including scheduling, submission of shop drawings, payment terms, rates for time and material work and notification of delays and extra work. The owner and architect/engineer must be aware that his or her actions should be avoided whenever possible. Causes of valid construction claims include extra work, project delays and acceleration, lack of management, limited site access and change in work schedule. The importance of record keeping is stressed. Detailed records help to establish facts if a dispute later develops. Records that should be kept include minutes of meetings, correspondence, progress reports, status logs and photographs.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1982-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0001052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

The owner and architect/engineer's roles in the prevention and resolution of construction claims are examined. A carefully written contract is invaluable in the prevention of a claim. Important aspects of construction contracts are presented, including scheduling, submission of shop drawings, payment terms, rates for time and material work and notification of delays and extra work. The owner and architect/engineer must be aware that his or her actions should be avoided whenever possible. Causes of valid construction claims include extra work, project delays and acceleration, lack of management, limited site access and change in work schedule. The importance of record keeping is stressed. Detailed records help to establish facts if a dispute later develops. Records that should be kept include minutes of meetings, correspondence, progress reports, status logs and photographs.
施工索赔的预防和解决
业主和建筑师/工程师在预防和解决施工索赔中的作用进行了审查。一份精心起草的合同在防止索赔方面是无价的。介绍了建筑合同的重要方面,包括日程安排、提交施工图、付款条件、时间和材料工作的费率以及延迟和额外工作的通知。业主和建筑师/工程师必须意识到,他或她的行为应该尽可能避免。有效的建筑索赔的原因包括额外的工作、项目延迟和加速、缺乏管理、有限的工地进入和工作时间表的改变。强调了记录的重要性。详细的记录有助于在日后发生争议时确定事实。应保留的记录包括会议纪要、通信记录、进度报告、状态日志和照片。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信