A Cost Managing Scheme for Power Transmission and Transformation using BIM

Nan Xu, Yan Song, Zhenxin Guo, Jing Nie, Xiangliang Sheri, Nianxia Han
{"title":"A Cost Managing Scheme for Power Transmission and Transformation using BIM","authors":"Nan Xu, Yan Song, Zhenxin Guo, Jing Nie, Xiangliang Sheri, Nianxia Han","doi":"10.1109/ICSCDE54196.2021.00010","DOIUrl":null,"url":null,"abstract":"To apply artificial intelligence technology to the sensitivity analysis of power transmission project cost factors, this paper uses BIM calculation system to realize the visualization of project calculation. Firstly, we analyze the information process of BIM during the process of power transmission and transformation project cost, and establish a power transmission and transformation project library that meets the calculation specification of power engineering quantity base on IFC. Then, through the comparison and selection of pricing schemes, the engineering quantity statistics is developed to read the quantities exported from the Revit model by pricing software. Finally, we adopt a real project to test the performance of our scheme and the experimental results show that the actual investment and cost estimation are within the scope of engineering practice, which basically meet the expected requirements.","PeriodicalId":208108,"journal":{"name":"2021 International Conference of Social Computing and Digital Economy (ICSCDE)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference of Social Computing and Digital Economy (ICSCDE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSCDE54196.2021.00010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To apply artificial intelligence technology to the sensitivity analysis of power transmission project cost factors, this paper uses BIM calculation system to realize the visualization of project calculation. Firstly, we analyze the information process of BIM during the process of power transmission and transformation project cost, and establish a power transmission and transformation project library that meets the calculation specification of power engineering quantity base on IFC. Then, through the comparison and selection of pricing schemes, the engineering quantity statistics is developed to read the quantities exported from the Revit model by pricing software. Finally, we adopt a real project to test the performance of our scheme and the experimental results show that the actual investment and cost estimation are within the scope of engineering practice, which basically meet the expected requirements.
基于BIM的输变电造价管理方案
为了将人工智能技术应用于输变电工程造价因素的敏感性分析,本文利用BIM计算系统实现工程计算的可视化。首先,分析输变电工程造价过程中BIM的信息流程,建立符合基于IFC的电力工程量计算规范的输变电工程库。然后,通过定价方案的比较和选择,开发工程量统计,通过定价软件读取Revit模型导出的工程量。最后,通过实际工程对方案进行了性能测试,实验结果表明,实际投资和成本估算在工程实际范围内,基本满足预期要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信