{"title":"A New Restoration Process in Power Systems with Large Scale of Dispersed Generation","authors":"T. Pham, Y. Bésanger, C. Andrieu, N. Hadjsaid, M. Fontela, B. Enacheanu","doi":"10.1109/TDC.2006.1668673","DOIUrl":null,"url":null,"abstract":"This paper presents a new effective restoration procedure designed for the electrical power system (EPS) with large scale of dispersed generation (DG) penetration. The \"deep build-together\" strategy is proposed to simultaneously consider this rebuilding by transmission and distribution networks, thereby, to serve the maximum of customers in a minimum of time. The restoration problem has to be now formulated as a multilevel, multi-objective optimization problem with constraints. The proposed method is designed with consideration to the network in the coming year which requires the introduction of new information and communication technologies (ICTs) components. Some simulations, using Eurostag software and a part of an IEEE New England 39 buses power system including a French type distribution network, with different cases (with a large scale of DG contributing or not in restoration process), will be shown to illustrate the DG ability in restoration process. The benefits of employing DG are also quantified","PeriodicalId":123024,"journal":{"name":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2006.1668673","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

Abstract

This paper presents a new effective restoration procedure designed for the electrical power system (EPS) with large scale of dispersed generation (DG) penetration. The "deep build-together" strategy is proposed to simultaneously consider this rebuilding by transmission and distribution networks, thereby, to serve the maximum of customers in a minimum of time. The restoration problem has to be now formulated as a multilevel, multi-objective optimization problem with constraints. The proposed method is designed with consideration to the network in the coming year which requires the introduction of new information and communication technologies (ICTs) components. Some simulations, using Eurostag software and a part of an IEEE New England 39 buses power system including a French type distribution network, with different cases (with a large scale of DG contributing or not in restoration process), will be shown to illustrate the DG ability in restoration process. The benefits of employing DG are also quantified
大规模分散发电电力系统的一种新的恢复过程
针对大规模分布式发电系统,提出了一种新的有效的电力系统恢复程序。提出了“深度共建”策略,同时考虑了输电和配电网络的重建,从而在最短的时间内为最大的客户服务。恢复问题现在必须表述为一个带约束的多层次、多目标优化问题。拟议方法的设计考虑到未来一年的网络,这需要引入新的信息和通信技术(ict)组件。利用Eurostag软件和IEEE新英格兰39总线电力系统的一部分,包括法国型配电网,在不同的情况下(在恢复过程中有大量DG贡献或没有贡献),将展示DG在恢复过程中的能力。使用DG的好处也被量化了
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信