Calculation of cost-minimal resources for the operation of electrical networks

Andreas Berg, Hans-Jürgen Haubrich
{"title":"Calculation of cost-minimal resources for the operation of electrical networks","authors":"Andreas Berg, Hans-Jürgen Haubrich","doi":"10.1109/EEM.2008.4579017","DOIUrl":null,"url":null,"abstract":"Operation expenditures for electrical networks are mainly caused by costs of resources, e. g. field service personnel, agency staff, material and tools. These resources are required for executing processes for maintenance, fault clearance as well as for investment projects. The network operatorpsilas resource allocation strategy for operating the network strongly depends on available resources and long-term planning of predictable processes. This paper presents a newly developed method for optimizing resources for the operation of electrical networks. For this, all relevant influencing factors on resource allocation, e.g. uncertain fault occurrences or stochastic durations of processes, have to be considered. As a result, minimal costs for operating the network may be quantified for network system operators in an objective manner. Functionality and practicality of the developed method are shown exemplarily based on a data set for maintenance and fault clearance for 65 high voltage substations.","PeriodicalId":118618,"journal":{"name":"2008 5th International Conference on the European Electricity Market","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 5th International Conference on the European Electricity Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2008.4579017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Operation expenditures for electrical networks are mainly caused by costs of resources, e. g. field service personnel, agency staff, material and tools. These resources are required for executing processes for maintenance, fault clearance as well as for investment projects. The network operatorpsilas resource allocation strategy for operating the network strongly depends on available resources and long-term planning of predictable processes. This paper presents a newly developed method for optimizing resources for the operation of electrical networks. For this, all relevant influencing factors on resource allocation, e.g. uncertain fault occurrences or stochastic durations of processes, have to be considered. As a result, minimal costs for operating the network may be quantified for network system operators in an objective manner. Functionality and practicality of the developed method are shown exemplarily based on a data set for maintenance and fault clearance for 65 high voltage substations.
电网运行的最小成本资源计算
电网的运营支出主要由资源成本引起,如现场服务人员、机构人员、材料和工具。执行维护过程、故障清除以及投资项目都需要这些资源。网络运营商的资源分配策略在很大程度上取决于可用资源和可预测过程的长期规划。本文提出了一种新的电网运行资源优化方法。为此,必须考虑所有影响资源分配的相关因素,例如不确定的故障发生或过程的随机持续时间。因此,对于网络系统运营商而言,运营网络的最低成本可以客观地量化。以65座高压变电所的检修和故障排除数据集为例,说明了该方法的功能性和实用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信