{"title":"Key aspects of implementing the help desk system in an educational institution","authors":"Oleg Nikiforov, L. Mukhametova","doi":"10.1145/3388984.3390876","DOIUrl":null,"url":null,"abstract":"The article summarizes the results of a practical study on the problem of automating the incident management process in the IT - infrastructure of an educational organization. Implementing an incident management system can lead to a complete overhaul of all processes. The cost-effectiveness of implementing the system in an educational organization can be reflected in saving working time when processing requests for maintenance. The organizational effectiveness of the project implementation will be reflected in a significant improvement in the quality of services provided by the organization's it infrastructure and their maintenance.","PeriodicalId":288007,"journal":{"name":"Proceedings of the III International Scientific and Practical Conference","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the III International Scientific and Practical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3388984.3390876","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The article summarizes the results of a practical study on the problem of automating the incident management process in the IT - infrastructure of an educational organization. Implementing an incident management system can lead to a complete overhaul of all processes. The cost-effectiveness of implementing the system in an educational organization can be reflected in saving working time when processing requests for maintenance. The organizational effectiveness of the project implementation will be reflected in a significant improvement in the quality of services provided by the organization's it infrastructure and their maintenance.