{"title":"Transient analysis of Tehran power grid considering future planned expansion","authors":"A. Khakpour, Amir Golshani, T. Schoenemann, S. Gorchakov","doi":"10.1109/ENERGYCON.2014.6850440","DOIUrl":null,"url":null,"abstract":"Future planned expansion of Tehran power network depicts that two new generating stations will be installed which result in the increase of short-circuit capacity at some of the grid substations in excess of the interrupting rating of exiting circuit breakers. Various measures regarding short-circuit current mitigation for high voltage application have been proposed in many literatures. This paper intends to investigate the consequence of utilizing three applicable measures (CLR, IPC and SCCL) by taking future model of Tehran power grid into consideration. A comprehensive comparison has been made and the results clearly demonstrate the effect of each measure on short-circuit current level, load flow results, transient stability and transient recovery of circuit breaker. For these purposes, DIgSILENT and EMTP-RV softwares are employed to simulate Tehran power grid and the outcome results revealed the benefits of utilizing IPC comparing to other measures.","PeriodicalId":410611,"journal":{"name":"2014 IEEE International Energy Conference (ENERGYCON)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Energy Conference (ENERGYCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYCON.2014.6850440","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Future planned expansion of Tehran power network depicts that two new generating stations will be installed which result in the increase of short-circuit capacity at some of the grid substations in excess of the interrupting rating of exiting circuit breakers. Various measures regarding short-circuit current mitigation for high voltage application have been proposed in many literatures. This paper intends to investigate the consequence of utilizing three applicable measures (CLR, IPC and SCCL) by taking future model of Tehran power grid into consideration. A comprehensive comparison has been made and the results clearly demonstrate the effect of each measure on short-circuit current level, load flow results, transient stability and transient recovery of circuit breaker. For these purposes, DIgSILENT and EMTP-RV softwares are employed to simulate Tehran power grid and the outcome results revealed the benefits of utilizing IPC comparing to other measures.
考虑未来扩建计划的德黑兰电网暂态分析
德黑兰电网未来计划的扩展表明,将安装两个新发电站,这将导致一些电网变电站的短路容量增加,超过现有断路器的中断额定值。在许多文献中提出了各种缓解高压应用中短路电流的措施。本文拟结合德黑兰电网的未来模式,探讨三种适用措施(CLR、IPC和SCCL)的应用效果。对各措施进行了综合比较,结果清楚地表明了各措施对短路电流水平、负荷流结果、断路器暂态稳定性和暂态恢复的影响。为此,使用DIgSILENT和EMTP-RV软件模拟德黑兰电网,结果显示与其他措施相比,使用IPC的好处。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信