{"title":"Prospective products and benefits of the Green AGH Campus Project: Providing scaled-down future smart grid experience","authors":"I. Wojnicki, S. Ernst, L. Kotulski","doi":"10.5220/0005494403950400","DOIUrl":null,"url":null,"abstract":"Smart grid stakeholders have partially opposing goals. New tools and utilities are needed to reach them. The paper discusses prospective products and benefits of the Green AGH Campus Project. The project provides energy management infrastructure being a test bed for future smart grid solutions. It is based on three main components: an Advanced Distribution Management System, a Power Data Warehouse and a Simulation System. Coupled together, they are capable of providing advices regarding either optimization of grid operations, or its design and topology. The optimizations are multicriteria and multivariant balancing stakeholders' needs.","PeriodicalId":408526,"journal":{"name":"2015 International Conference on Smart Cities and Green ICT Systems (SMARTGREENS)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Smart Cities and Green ICT Systems (SMARTGREENS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5220/0005494403950400","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Smart grid stakeholders have partially opposing goals. New tools and utilities are needed to reach them. The paper discusses prospective products and benefits of the Green AGH Campus Project. The project provides energy management infrastructure being a test bed for future smart grid solutions. It is based on three main components: an Advanced Distribution Management System, a Power Data Warehouse and a Simulation System. Coupled together, they are capable of providing advices regarding either optimization of grid operations, or its design and topology. The optimizations are multicriteria and multivariant balancing stakeholders' needs.