Connection and disconnection of large conductive parts during live working at HV and VHV

N. Oury, G. Riquel
{"title":"Connection and disconnection of large conductive parts during live working at HV and VHV","authors":"N. Oury, G. Riquel","doi":"10.1109/ICOLIM.2014.6934342","DOIUrl":null,"url":null,"abstract":"During live working at high and very voltage, it may be necessary to connect or disconnect parts of the network, but also large conducting parts. To carry out these operations, it is necessary to control: values of current passing to the place where connection or disconnection is made, particularly if you want to carry out operations using the bare hand working method,; the maximum length of the discharge arc to guarantee LW distances,; but also another fundamental parameter, the connection or disconnection speed, particularly if you want to carry out these operations manually without using an appropriate device.","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934342","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

During live working at high and very voltage, it may be necessary to connect or disconnect parts of the network, but also large conducting parts. To carry out these operations, it is necessary to control: values of current passing to the place where connection or disconnection is made, particularly if you want to carry out operations using the bare hand working method,; the maximum length of the discharge arc to guarantee LW distances,; but also another fundamental parameter, the connection or disconnection speed, particularly if you want to carry out these operations manually without using an appropriate device.
高压和超高压带电工作时大型导电部件的连接和断开
在高压和高压下带电工作时,可能需要连接或断开网络的部分,也可能需要连接或断开大型导电部分。为了进行这些操作,有必要控制:通过连接或断开的地方的电流值,特别是如果您想使用徒手工作方法进行操作;保证LW距离的最大放电电弧长度;还有另一个基本参数,连接或断开连接的速度,特别是如果你想在不使用适当设备的情况下手动执行这些操作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信