WIND FARM LOCATION SELECTION AT THE SOUTHERN COAST OF YOGYAKARTA PROVINCE FOR ENERGY SUPPLY OF HYDROGEN FUEL PRODUCTION

Irwan Setyaji, A. Budiman, W. Wilopo, Ridwan Aji Budi Prasetyo
{"title":"WIND FARM LOCATION SELECTION AT THE SOUTHERN COAST OF YOGYAKARTA PROVINCE FOR ENERGY SUPPLY OF HYDROGEN FUEL PRODUCTION","authors":"Irwan Setyaji, A. Budiman, W. Wilopo, Ridwan Aji Budi Prasetyo","doi":"10.22146/ajse.v4i2.63220","DOIUrl":null,"url":null,"abstract":"Online version available at http://journal.ugm.ac.id/index.php/ajse 31 Abstract The depletion of non-renewable energy reserves and increased awareness of environmental damage caused by fossil-based fuel use have encouraged the world’s efforts to develop and utilize new and renewable energy sources, including in Indonesia, especially in the special region of Yogyakarta. The potential for wind power plants can be developed in 3 districts in the southern part of Yogyakarta, bordering the Java Sea, to be converted into hydrogen through an electrolysis process. The three research locations were Bugel Beach in Kulon Progo, Pandansimo Baru Beach in Bantul, and Baron Techno Park at Baron Beach in Gunung Kidul. The selection of the most optimum location was made employing the Analytic Hierarchy Process (AHP) method by considering three factors, namely technical, location, and socio-economic factors. The first factor includes the potential for electricity generation from wind power and the available land area. The second one consists of sub-factors, namely access to the location and the distance to the PLN electricity distribution line. Then the last one includes conflicts with tourism and the economic activities of the surrounding community. After obtaining the most suitable location, planning is carried out for the wind farm that is built, the amount of electrical energy produced, the cost of generating electricity, and the cost of producing hydrogen from the electrolysis process. Pandansimo Baru Beach is an ideal location, with an average wind speed of 4.833 m/s. Five Vestas V8","PeriodicalId":280593,"journal":{"name":"ASEAN Journal of Systems Engineering","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Journal of Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22146/ajse.v4i2.63220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Online version available at http://journal.ugm.ac.id/index.php/ajse 31 Abstract The depletion of non-renewable energy reserves and increased awareness of environmental damage caused by fossil-based fuel use have encouraged the world’s efforts to develop and utilize new and renewable energy sources, including in Indonesia, especially in the special region of Yogyakarta. The potential for wind power plants can be developed in 3 districts in the southern part of Yogyakarta, bordering the Java Sea, to be converted into hydrogen through an electrolysis process. The three research locations were Bugel Beach in Kulon Progo, Pandansimo Baru Beach in Bantul, and Baron Techno Park at Baron Beach in Gunung Kidul. The selection of the most optimum location was made employing the Analytic Hierarchy Process (AHP) method by considering three factors, namely technical, location, and socio-economic factors. The first factor includes the potential for electricity generation from wind power and the available land area. The second one consists of sub-factors, namely access to the location and the distance to the PLN electricity distribution line. Then the last one includes conflicts with tourism and the economic activities of the surrounding community. After obtaining the most suitable location, planning is carried out for the wind farm that is built, the amount of electrical energy produced, the cost of generating electricity, and the cost of producing hydrogen from the electrolysis process. Pandansimo Baru Beach is an ideal location, with an average wind speed of 4.833 m/s. Five Vestas V8
风电场选址在日惹省南部沿海,为氢燃料生产提供能源
31摘要:不可再生能源储备的枯竭和对化石燃料使用造成的环境破坏意识的提高,鼓励了世界各国,包括印度尼西亚,特别是日惹特殊地区,努力开发和利用新能源和可再生能源。可以在日惹南部与爪哇海接壤的3个地区开发风力发电厂的潜力,通过电解过程将其转化为氢气。三个研究地点是Kulon Progo的Bugel海滩、Bantul的Pandansimo Baru海滩和Gunung Kidul Baron海滩的Baron Techno Park。采用层次分析法,综合考虑技术因素、区位因素和社会经济因素,进行最优选址。第一个因素包括风力发电的潜力和可用的土地面积。第二个因素由子因素组成,即访问位置和到PLN配电线路的距离。最后一个包括与旅游业和周边社区经济活动的冲突。在获得最合适的位置后,对要建的风电场、产生的电能、发电成本以及电解制氢的成本进行规划。Pandansimo Baru海滩是一个理想的地点,平均风速为4.833米/秒。五台维斯塔斯V8
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信