{"title":"CASCH-a scheduling algorithm for 'high level'-synthesis","authors":"P. Gutberlet, Heinrich Krämer, W. Rosenstiel","doi":"10.1109/EDAC.1991.206414","DOIUrl":null,"url":null,"abstract":"It is the goal of the recently developed and herewith presented scheduling algorithm to optimize the timing behaviour within automated circuit synthesis. The algorithm is a part of the CADDY-synthesis-system (CAddy SCHeduling). The basis is a list scheduling algorithm which is controlled by a heuristic rating function. The allocated resources can be modelled in a flexible and detailed manner in order to specify component types for several different operations as well as different component types for the same operation. It is a special feature of this scheduling algorithm that the assignment of operations to component types is decided during the scheduling.<<ETX>>","PeriodicalId":425087,"journal":{"name":"Proceedings of the European Conference on Design Automation.","volume":"328 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-02-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"19","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the European Conference on Design Automation.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EDAC.1991.206414","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 19
Abstract
It is the goal of the recently developed and herewith presented scheduling algorithm to optimize the timing behaviour within automated circuit synthesis. The algorithm is a part of the CADDY-synthesis-system (CAddy SCHeduling). The basis is a list scheduling algorithm which is controlled by a heuristic rating function. The allocated resources can be modelled in a flexible and detailed manner in order to specify component types for several different operations as well as different component types for the same operation. It is a special feature of this scheduling algorithm that the assignment of operations to component types is decided during the scheduling.<>