{"title":"The Model of Risk Allocation in BOT Expressway Project","authors":"Chen Yun, T. Wei","doi":"10.1109/ICIII.2008.60","DOIUrl":null,"url":null,"abstract":"In this article the main bodies of risk allocation and the risk factors are analyzed. The risk matrix for participators has been established by using fuzzy and AHP, according to the superior allocation principle, the matrix is solved so that each kind of risk can be determined to most superior undertaker by the Hungarian.","PeriodicalId":185591,"journal":{"name":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIII.2008.60","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
In this article the main bodies of risk allocation and the risk factors are analyzed. The risk matrix for participators has been established by using fuzzy and AHP, according to the superior allocation principle, the matrix is solved so that each kind of risk can be determined to most superior undertaker by the Hungarian.