Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania

N. Chileshe, N. Kavishe, D. Edwards
{"title":"Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania","authors":"N. Chileshe, N. Kavishe, D. Edwards","doi":"10.1108/ci-09-2019-0098","DOIUrl":null,"url":null,"abstract":"Design/methodology/approach – An interpretivist epistemological design was adapted to extensively manually review and search extant literature on bid or no bid decision making criteria. A total of 30 most common bid/no bid decision making criteria were identified. These were included in a questionnaire survey data collection instrument. The survey was distributed to 40 small indigenous building contractors in Dar es Salaam, Tanzania. 33 responses were received. Response data was subjected to both descriptive and inferential statistics.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-09-2019-0098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

Design/methodology/approach – An interpretivist epistemological design was adapted to extensively manually review and search extant literature on bid or no bid decision making criteria. A total of 30 most common bid/no bid decision making criteria were identified. These were included in a questionnaire survey data collection instrument. The survey was distributed to 40 small indigenous building contractors in Dar es Salaam, Tanzania. 33 responses were received. Response data was subjected to both descriptive and inferential statistics.
影响坦桑尼亚本土小型建筑承包商投标或不投标决策的关键因素
设计/方法论/方法-采用解释主义认识论设计,广泛手动审查和搜索有关投标或不投标决策标准的现有文献。共确定了30个最常见的投标/不投标决策标准。这些都包括在问卷调查数据收集工具。这项调查已分发给坦桑尼亚达累斯萨拉姆的40个小型土著建筑承包商,收到33份答复。对反应数据进行描述性和推断性统计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信