B. Seitz, C. Salire, G. Harwood, J. N. Peterson, H. Hess
{"title":"Remote microhydroelectric power generation system","authors":"B. Seitz, C. Salire, G. Harwood, J. N. Peterson, H. Hess","doi":"10.1109/IAS.2004.1348869","DOIUrl":null,"url":null,"abstract":"Design, construction, and testing of a complete small-scale hydroelectric generation system for a remote research facility. Using results of a feasibility study, a system configuration is proposed to optimize performance and allow for future expansion. Within this system design, component selection tradeoffs are discussed and appropriate selections are justified. Results of testing of the system in the laboratory are presented and modifications recommended. The system was installed and has operated reliably in the field for six years.","PeriodicalId":131410,"journal":{"name":"Conference Record of the 2004 IEEE Industry Applications Conference, 2004. 39th IAS Annual Meeting.","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of the 2004 IEEE Industry Applications Conference, 2004. 39th IAS Annual Meeting.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2004.1348869","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Design, construction, and testing of a complete small-scale hydroelectric generation system for a remote research facility. Using results of a feasibility study, a system configuration is proposed to optimize performance and allow for future expansion. Within this system design, component selection tradeoffs are discussed and appropriate selections are justified. Results of testing of the system in the laboratory are presented and modifications recommended. The system was installed and has operated reliably in the field for six years.