A RESOURCE OPTIMISATION BASED HEURISTIC FOR RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM

Mazhar Ali, Saif Ullah, M. Jahanzaib
{"title":"A RESOURCE OPTIMISATION BASED HEURISTIC FOR RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM","authors":"Mazhar Ali, Saif Ullah, M. Jahanzaib","doi":"10.35453/nedjr-ascn-2018-0092","DOIUrl":null,"url":null,"abstract":"Resource constrained project scheduling problem has significant application in industries. Although several heuristic solutions have been developed in the literature to address this problem, most of these have lesser focus on scheduling of shared and scarce resources. The presented study proposes a resource optimisation based heuristic (ROBH) to optimise the utilisation of shared resources so as to minimise the penalty cost of projects. The proposed ROBH identifies shared resources within the project activities and shifts the activities from the bottleneck resource to the residual resources. The performance of the proposed ROBH was tested using the standard benchmark instances of project scheduling problems available in the existing literature. The results were compared with those obtained from the heuristics available in the project scheduling problem library. This comparison indicated that the results provided by ROBH are significant as compared to the results obtained from the heuristics available in the literature.","PeriodicalId":259216,"journal":{"name":"NED University Journal of Research","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NED University Journal of Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35453/nedjr-ascn-2018-0092","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Resource constrained project scheduling problem has significant application in industries. Although several heuristic solutions have been developed in the literature to address this problem, most of these have lesser focus on scheduling of shared and scarce resources. The presented study proposes a resource optimisation based heuristic (ROBH) to optimise the utilisation of shared resources so as to minimise the penalty cost of projects. The proposed ROBH identifies shared resources within the project activities and shifts the activities from the bottleneck resource to the residual resources. The performance of the proposed ROBH was tested using the standard benchmark instances of project scheduling problems available in the existing literature. The results were compared with those obtained from the heuristics available in the project scheduling problem library. This comparison indicated that the results provided by ROBH are significant as compared to the results obtained from the heuristics available in the literature.
基于资源优化的启发式算法求解资源约束项目调度问题
资源约束下的项目调度问题具有重要的工业应用价值。虽然在文献中已经开发了几个启发式解决方案来解决这个问题,但其中大多数都较少关注共享和稀缺资源的调度。本研究提出了一种基于资源优化的启发式算法(ROBH)来优化共享资源的利用,从而使项目的惩罚成本最小化。建议的ROBH确定项目活动中的共享资源,并将活动从瓶颈资源转移到剩余资源。使用现有文献中可用的项目调度问题的标准基准实例对所提出的ROBH的性能进行了测试。结果与项目调度问题库中的启发式方法进行了比较。这个比较表明ROBH提供的结果与文献中可用的启发式结果相比是显著的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.10
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信