Research on the scheduling system in aluminum industry based on Multi-agent

Fantian Zou, Erwei Yin, Feng-xing Zou
{"title":"Research on the scheduling system in aluminum industry based on Multi-agent","authors":"Fantian Zou, Erwei Yin, Feng-xing Zou","doi":"10.1109/ICAL.2010.5585354","DOIUrl":null,"url":null,"abstract":"Contra pose the character of scheduling problem in the aluminum industry, a virtual enterprise is abstracted in this paper. The VE substitute manufacturing techniques. A model of scheduling system during aluminum industry is also established based on a Multi-agent theory. As a foundation we will study the system model concerning every agent's working mechanism and the mechanism of corresponding with each other among agents. This model totally separates the two hierarchies, virtual enterprise level and leaguer level. This hierarchy is propitious to realize a perfect collocation of resource in the whole aluminum industry; it has preferable flexibility and expansibility. To achieve the production of aluminum industry optimal scheduling, lay the foundation for achieving the objective of decreasing energy consumption and optimal scheduling in the aluminum industry.","PeriodicalId":393739,"journal":{"name":"2010 IEEE International Conference on Automation and Logistics","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE International Conference on Automation and Logistics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAL.2010.5585354","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Contra pose the character of scheduling problem in the aluminum industry, a virtual enterprise is abstracted in this paper. The VE substitute manufacturing techniques. A model of scheduling system during aluminum industry is also established based on a Multi-agent theory. As a foundation we will study the system model concerning every agent's working mechanism and the mechanism of corresponding with each other among agents. This model totally separates the two hierarchies, virtual enterprise level and leaguer level. This hierarchy is propitious to realize a perfect collocation of resource in the whole aluminum industry; it has preferable flexibility and expansibility. To achieve the production of aluminum industry optimal scheduling, lay the foundation for achieving the objective of decreasing energy consumption and optimal scheduling in the aluminum industry.
基于多智能体的铝工业调度系统研究
针对铝工业调度问题的特点,抽象出一个虚拟企业。VE替代制造技术。基于多智能体理论,建立了铝工业调度系统模型。在此基础上,我们将研究各个智能体的工作机制和智能体之间相互对应的机制。该模型完全分离了虚拟企业层和联盟层两个层次。这种层次结构有利于实现整个铝行业资源的完美配置;具有较好的灵活性和可扩展性。实现铝工业生产的优化调度,为实现铝工业降低能耗和优化调度的目标奠定基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信