{"title":"Building sustainability","authors":"Petra Kuppers","doi":"10.4324/9780429061448-7","DOIUrl":null,"url":null,"abstract":"© Renoir Consulting Limited. This document remains the property of Renoir Consulting Limited and must not be copied or distributed in hardcopy or electronic form without the prior written approval of Renoir Consulting Limited. ANALYSIS Renoir conducted a detailed three-week analysis of the Dennis operation in Guildford, near London. The findings showed that there was a potential to reduce build times by 20%–30% by tightening standards and removing the causes of lost time. It was decided to start the process in the frame shop, the first stage of the process, where the chassis frames are welded.","PeriodicalId":208019,"journal":{"name":"Community Performance","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Community Performance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9780429061448-7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
建筑可持续发展
©雷诺阿咨询有限公司本文件为雷诺阿咨询有限公司的财产,未经雷诺阿咨询有限公司事先书面批准,不得复制或以硬拷贝或电子形式分发。雷诺阿在伦敦附近的吉尔福德对丹尼斯的行动进行了为期三周的详细分析。研究结果表明,通过收紧标准和消除造成时间损失的原因,有可能将构建时间减少20%-30%。决定在框架车间开始这个过程,这是该过程的第一阶段,底盘框架是焊接的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。