{"title":"Optimal Substation Location Of A Wind Farm Using Different Metaheuristic Algorithms","authors":"Chakib El Mokhi, A. Addaim","doi":"10.1109/ICOA49421.2020.9094469","DOIUrl":null,"url":null,"abstract":"This article presents the optimization of the substation location of a wind farm using metaheuristic algorithms. This method can reduce the total length of cable which has a direct impact on the electrical power losses. The cost of the electrical system is estimated between 15–30% of the total investment costs. By optimizing the substation location, these high costs can be avoided even in the design phase of the wind farm. The optimization methods are tested on a regular as well as an irregular wind farm. In order to check the reliability of the optimization methods, two real existing onshore and offshore wind farms are used. The results of the proposed optimization show that the optimization of the substation location is an effective way to design the wind farm layout with low cost.","PeriodicalId":253361,"journal":{"name":"2020 IEEE 6th International Conference on Optimization and Applications (ICOA)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 6th International Conference on Optimization and Applications (ICOA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOA49421.2020.9094469","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

This article presents the optimization of the substation location of a wind farm using metaheuristic algorithms. This method can reduce the total length of cable which has a direct impact on the electrical power losses. The cost of the electrical system is estimated between 15–30% of the total investment costs. By optimizing the substation location, these high costs can be avoided even in the design phase of the wind farm. The optimization methods are tested on a regular as well as an irregular wind farm. In order to check the reliability of the optimization methods, two real existing onshore and offshore wind farms are used. The results of the proposed optimization show that the optimization of the substation location is an effective way to design the wind farm layout with low cost.
基于不同元启发式算法的风电场变电站最优选址
本文提出了用元启发式算法优化风电场变电站位置的方法。这种方法可以减少电缆的总长度,直接影响到电力损耗。电力系统的成本估计在总投资成本的15-30%之间。通过优化变电站的位置,甚至在风电场的设计阶段就可以避免这些高成本。优化方法在常规风电场和不规则风电场上进行了试验。为了验证优化方法的可靠性,使用了两个实际的陆上和海上风电场。优化结果表明,变电站位置优化是设计低成本风电场布局的有效途径。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信