{"title":"A reliability and economic evaluation of a transmission system-I: Using frequency and duration of failure method","authors":"A. Shaban, A. Go","doi":"10.1109/SSST.1993.522749","DOIUrl":null,"url":null,"abstract":"The reliability of a transmission system model consisting of transmission lines, transformers, and circuit breakers is calculated from sample data using the frequency and duration method. The model is modified by adding another transmission line and a transformer to study the effect on reliability. A significant decrease in system down time is found when a transformer is added in parallel with the two existing ones, whereas adding another transmission line produces only a minimal decrease. A study has been conducted to determine whether it is economically feasible to add another transformer to increase the model system's reliability and decrease its down time. During a twenty-year period, it was found that the savings of energy, and the dollars associated with it, exceeds the costs of the additional transformer.","PeriodicalId":260036,"journal":{"name":"1993 (25th) Southeastern Symposium on System Theory","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1993 (25th) Southeastern Symposium on System Theory","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SSST.1993.522749","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

The reliability of a transmission system model consisting of transmission lines, transformers, and circuit breakers is calculated from sample data using the frequency and duration method. The model is modified by adding another transmission line and a transformer to study the effect on reliability. A significant decrease in system down time is found when a transformer is added in parallel with the two existing ones, whereas adding another transmission line produces only a minimal decrease. A study has been conducted to determine whether it is economically feasible to add another transformer to increase the model system's reliability and decrease its down time. During a twenty-year period, it was found that the savings of energy, and the dollars associated with it, exceeds the costs of the additional transformer.
输电系统的可靠性和经济性评估i:使用故障频率和持续时间法
采用频率和持续时间法从样本数据中计算由输电线路、变压器和断路器组成的输电系统模型的可靠性。通过增加另一条传输线和变压器对模型进行修正,研究对可靠性的影响。当在现有的两个变压器并联上增加一个变压器时,系统停机时间会显著减少,而增加另一条传输线只会产生最小的减少。为了提高模型系统的可靠性,减少其停机时间,在经济上是否可行,我们进行了研究。在20年的时间里,人们发现节省的能源和与之相关的美元,超过了额外的变压器的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信