{"title":"A review of under-frequency load shedding scheme on TNB system","authors":"A. A. Mohd Zin, H. Mohd Hafiz, M. S. Aziz","doi":"10.1109/PECON.2004.1461637","DOIUrl":null,"url":null,"abstract":"Safe operation of a power system requires that system frequency be kept within a specified range. When the generation is insufficient due to disturbances, the frequency might fall under the minimum allowable value, which may lead to system blackout if not properly counteracted. This frequency decline may be corrected by shedding certain amount of load so that the system is back into balanced state. This paper reports a case study on Malaysia's TNB system. UFLS scheme used by TNB was reviewed. Then modification and improvement was made to reflect the current changes in the system making the scheme more up to date. Effect of having more stages to reduce over shedding and combination of different amount of load at each stage are discussed.","PeriodicalId":375856,"journal":{"name":"PECon 2004. Proceedings. National Power and Energy Conference, 2004.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2004-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"34","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PECon 2004. Proceedings. National Power and Energy Conference, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECON.2004.1461637","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 34

Abstract

Safe operation of a power system requires that system frequency be kept within a specified range. When the generation is insufficient due to disturbances, the frequency might fall under the minimum allowable value, which may lead to system blackout if not properly counteracted. This frequency decline may be corrected by shedding certain amount of load so that the system is back into balanced state. This paper reports a case study on Malaysia's TNB system. UFLS scheme used by TNB was reviewed. Then modification and improvement was made to reflect the current changes in the system making the scheme more up to date. Effect of having more stages to reduce over shedding and combination of different amount of load at each stage are discussed.
TNB系统低频减载方案综述
电力系统的安全运行要求系统频率保持在规定的范围内。当由于干扰导致发电量不足时,频率可能低于最小允许值,如果不适当抵消,可能导致系统停电。这种频率的下降可以通过减少一定数量的负载来纠正,从而使系统回到平衡状态。本文以马来西亚TNB制度为例进行研究。综述了TNB采用的UFLS方案。然后进行修改和改进,以反映当前系统的变化,使方案更具时效性。讨论了多级减少过脱落的效果以及每一级不同负荷的组合。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信