High Voltage program with a multi craft work force

J. Rachford
{"title":"High Voltage program with a multi craft work force","authors":"J. Rachford","doi":"10.1109/ESW.2009.4813964","DOIUrl":null,"url":null,"abstract":"Performing High Voltage maintenance with a multi craft work force in an industrial plant creates a special set of safety circumstances. The team associates may be performing mechanical maintenance in the morning, operating the process equipment during the day, and then have to perform a High Voltage switching operation later in the day. It is critical under these circumstances that the associates are properly trained and that there is a good maintenance program in place for the equipment. This paper describes how one mini mill steel plant designed a successful High Voltage maintenance program that ensures safety for its work force and provides a high level of plant reliability. The program is in full compliance with NFPA 70E and OSHA 1910.269.","PeriodicalId":233621,"journal":{"name":"2009 IEEE IAS Electrical Safety Workshop","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE IAS Electrical Safety Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESW.2009.4813964","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Performing High Voltage maintenance with a multi craft work force in an industrial plant creates a special set of safety circumstances. The team associates may be performing mechanical maintenance in the morning, operating the process equipment during the day, and then have to perform a High Voltage switching operation later in the day. It is critical under these circumstances that the associates are properly trained and that there is a good maintenance program in place for the equipment. This paper describes how one mini mill steel plant designed a successful High Voltage maintenance program that ensures safety for its work force and provides a high level of plant reliability. The program is in full compliance with NFPA 70E and OSHA 1910.269.
高压程序具有多工艺的工作队伍
在工业工厂中,使用多工艺工作人员进行高压维护会产生一套特殊的安全环境。团队成员可能在早上进行机械维护,在白天操作工艺设备,然后在当天晚些时候必须执行高压开关操作。在这种情况下,对员工进行适当的培训,并为设备制定良好的维护计划是至关重要的。本文介绍了一家小型钢厂如何设计成功的高压维护方案,以确保其员工的安全,并提供高水平的工厂可靠性。该方案完全符合NFPA 70E和OSHA 1910.269。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信