Research on Risk Management of Aviation Complex Equipment Collaborative Development Project

Xiaojuan Zhu, Yongbo Cheng
{"title":"Research on Risk Management of Aviation Complex Equipment Collaborative Development Project","authors":"Xiaojuan Zhu, Yongbo Cheng","doi":"10.2991/ICOEME-19.2019.129","DOIUrl":null,"url":null,"abstract":"Firstly, this paper expounds the background of the risk management problem of aviation complex equipment collaborative development project, and points out the significance of studying this problem. Secondly, this paper analyzes the risk occurrence mechanism of aviation complex equipment collaborative development project, and introduces the milestone events and the relationship between events. In addition, based on the system optimal control theory and the risk transfer function, with the goal of minimizing risk loss and risk control cost, this paper constructs a risk optimization model for the aviation complex equipment collaborative development system, and solves the degree of risk optimization of the milestone events. Finally, the model is validated by an example, which proves the validity of the model and provides reference for the collaborative development of aviation complex equipment in the future. Keywords—aviation complex equipment; risk management; milestone events","PeriodicalId":133507,"journal":{"name":"Proceedings of the 2nd International Conference on Economy, Management and Entrepreneurship (ICOEME 2019)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2nd International Conference on Economy, Management and Entrepreneurship (ICOEME 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/ICOEME-19.2019.129","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Firstly, this paper expounds the background of the risk management problem of aviation complex equipment collaborative development project, and points out the significance of studying this problem. Secondly, this paper analyzes the risk occurrence mechanism of aviation complex equipment collaborative development project, and introduces the milestone events and the relationship between events. In addition, based on the system optimal control theory and the risk transfer function, with the goal of minimizing risk loss and risk control cost, this paper constructs a risk optimization model for the aviation complex equipment collaborative development system, and solves the degree of risk optimization of the milestone events. Finally, the model is validated by an example, which proves the validity of the model and provides reference for the collaborative development of aviation complex equipment in the future. Keywords—aviation complex equipment; risk management; milestone events
航空复杂装备协同开发项目风险管理研究
本文首先阐述了航空复杂装备协同开发项目风险管理问题产生的背景,指出了研究该问题的意义。其次,分析了航空复杂装备协同开发项目的风险发生机制,介绍了里程碑事件和事件之间的关系。此外,基于系统最优控制理论和风险传递函数,以风险损失和风险控制成本最小化为目标,构建了航空复杂装备协同开发系统的风险优化模型,求解了里程碑事件的风险优化程度。最后通过算例对模型进行了验证,验证了模型的有效性,为今后航空复杂装备协同开发提供了参考。关键词:航空复合装备;风险管理;里程碑事件
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信