S. Mitsunobu, K. Asano, Takaaki Furuya, Y. Ishi, Y. Kijima, K. Sennyu, Tsuyoshi Tajima, T. Takahashi, S. Zhao
{"title":"Status and development of superconducting cavity for KEKB","authors":"S. Mitsunobu, K. Asano, Takaaki Furuya, Y. Ishi, Y. Kijima, K. Sennyu, Tsuyoshi Tajima, T. Takahashi, S. Zhao","doi":"10.1109/PAC.1997.753057","DOIUrl":null,"url":null,"abstract":"After successful test of 500 mA (Max 573 mA) electron beam at TRISTAN Accumulation ring (AR) using a prototype superconducting cavity, more than 4 superconducting cavities will be installed in High Energy Ring (HER) of KEK B-factory. The initial 4 superconducting cavities are almost same as the prototype one. The tests and results of the critical components of superconducting cavity system is described.","PeriodicalId":122662,"journal":{"name":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1997.753057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9
Abstract
After successful test of 500 mA (Max 573 mA) electron beam at TRISTAN Accumulation ring (AR) using a prototype superconducting cavity, more than 4 superconducting cavities will be installed in High Energy Ring (HER) of KEK B-factory. The initial 4 superconducting cavities are almost same as the prototype one. The tests and results of the critical components of superconducting cavity system is described.